Cancellation - Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 29/12/2023
Cancellation - Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 29/12/2023
Refer AEMO Electricity Market Notice 115398.
Constraint set CA_BRIS_54F2D1C0 revoked 1710 hrs.
This constraint set contains equations with the following interconnector on the LHS;
VIC1-NSW1
Manager NEM Real Time Operations
Direction - SA region 01/03/2024
Direction - SA region 01/03/2024
In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a).
The direction was necessary to maintain the power system in a secure operating state.
AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.
The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1705 hrs on 01/03/2024.
Intervention pricing does not apply to this AEMO intervention event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Para - Roseworthy 132 kV Line - SA region - 01/03/2024
Inter-regional transfer limit variation - Para - Roseworthy 132 kV Line - SA region - 01/03/2024
At 1515 hrs 01/03/2024 there was a short notice outage of Para - Roseworthy 132 kV Line.
The following constraint set was invoked at 1530 hrs 01/03/2024
S-PARS
This constraint set contains equations with the following interconnectors on the LHS.
V-S-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 29/02/2024
Cancellation - AEMO Intervention Event - Intervention trading intervals - Direction SA region 29/02/2024
Refer Market Notice 115364
The AEMO Intervention Event and all associated directions are cancelled from 1535 hrs 01/03/2024
Manager NEM Real Time Operations
Update - Possible intervention to manage power system security in SA region
Update - Possible intervention to manage power system security in SA region
Refer AEMO Electricity Market Notice 115403
The synchronous generating units currently expected to be synchronised in SA from 0100 hrs 02/03/2024 will be inadequate to maintain a secure operating state in SA .
AEMO estimates that, in the absence of sufficient market response by 1700 hrs 01/03/2024, AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Mt Piper 500/330 kV TIE1 Transformer - NSW region - 01/03/2024
Inter-regional transfer limit variation - Mt Piper 500/330 kV TIE1 Transformer - NSW region - 01/03/2024
At 0747 hrs 01/03/2024 there was an unplanned outage of Mt Piper 500/330 kV TIE1 Transformer.
Constraint set(s) invoked: N-MPTX
The following constraint set(s) invoked at 0755 hrs 01/03/2024
N-MPTX
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Possible intervention to manage power system security in SA Region
Possible intervention to manage power system security in SA Region
The synchronous generating units currently expected to be synchronised in SA from 0000 hrs 02/03/2024 will be inadequate to maintain a secure operating state in SA.
AEMO may need to intervene by issuing a direction requiring one or more SA synchronous generating unit(s) to operate or remain synchronised to maintain power system security in SA.
Manager NEM Real Time Operations