Filter by category
Filter by Date
[EventId:202403091625_confirmed] Prices for interval 09-Mar-2024 16:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1650 hrs on 9 March 2024
PRICES ARE NOW CONFIRMED for trading interval 09-Mar-2024 16:25.
In accordance with Market Notice 115553 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1800 hrs 14/03/2024 to 1830 hrs 14/03/2024.
The forecast capacity reserve requirement is 1780 MW.
The minimum capacity reserve available is 1493 MW.
Manager NEM Real Time Operations
[EventId:202403041130_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 04 March 2024 11:30
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 4 March 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 March 2024.
Refer to market notice: 115475
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1130 hrs on 4 March 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202403041005_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 04 March 2024 10:05
Issued by Australian Energy Market Operator Ltd at 1005 hrs on 4 March 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 4 March 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1005 hrs on 4 March 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202403031630_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 March 2024 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 3 March 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2024.
Refer to market notice: 115457
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1630 hrs on 3 March 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202403031535_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 March 2024 15:35
Issued by Australian Energy Market Operator Ltd at 1535 hrs on 3 March 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1535 hrs on 3 March 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
[EventId:202403031330_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 03 March 2024 13:30
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 3 March 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2024.
Refer to market notice: 115443
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1330 hrs on 3 March 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202403031135_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 03 March 2024 11:35
Issued by Australian Energy Market Operator Ltd at 1135 hrs on 3 March 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 3 March 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1135 hrs on 3 March 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.