PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 20/05/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No.116700 has been updated at 1450 hrs to the following:
[1.] From 1630 hrs 20/05/2024 to 1900 hrs 20/05/2024.
The forecast capacity reserve requirement is 1630 MW.
The minimum capacity reserve available is 958 MW.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 23/05/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 0000 hrs to 0130 hrs 23/05/2024.
The forecast capacity reserve requirement is 1640 MW.
The minimum capacity reserve available is 1422 MW.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 22/05/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 116703 has been updated at 1400 hrs 20/05/2024 to the following:
1. From 0600 hrs to 0800 hrs 22/05/2024.
The forecast capacity reserve requirement is 1630 MW.
The minimum capacity reserve available is 1386 MW.
2. From 1630 hrs to 2359 hrs 22/05/2024.
The forecast capacity reserve requirement is 1610 MW.
The minimum capacity reserve available is 1337 MW.
AEMO Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 21/05/2024
[1.] From 1730 hrs 21/05/2024 to 1800 hrs 21/05/2024.
The forecast capacity reserve requirement is 1600 MW.
The minimum capacity reserve available is 1416 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 22/05/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 116681 has been updated at 1430 hrs 19/05/2024 to the following:
[1.] From 0530 hrs 22/05/2024 to 0700 hrs 22/05/2024.
The forecast capacity reserve requirement is 1630 MW.
The minimum capacity reserve available is 1349 MW.
[2.] From 0800 hrs 22/05/2024 to 0830 hrs 22/05/2024.
The forecast capacity reserve requirement is 1630 MW.
The minimum capacity reserve available is 1612 MW.
[3.] From 1600 hrs 22/05/2024 to 0200 hrs 23/05/2024.
The forecast capacity reserve requirement is 1610 MW.
The minimum capacity reserve available is 1282 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 21/05/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 116680 has been updated at 1430 hrs 19/05/2024 to the following:
[1.] From 0630 hrs 21/05/2024 to 0730 hrs 21/05/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1320 MW.
[2.] From 1600 hrs 21/05/2024 to 1630 hrs 21/05/2024.
The forecast capacity reserve requirement is 1600 MW.
The minimum capacity reserve available is 1494 MW.
[3.] From 2100 hrs 21/05/2024 to 0030 hrs 22/05/2024.
The forecast capacity reserve requirement is 1630 MW.
The minimum capacity reserve available is 1332 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 20/05/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1700 hrs 20/05/2024 to 1900 hrs 20/05/2024.
The forecast capacity reserve requirement is 1630 MW.
The minimum capacity reserve available is 1110 MW.
Manager NEM Real Time Operations
Cancellation of Actual (LOR1) condition in the NSW region - 18/05/2024
Cancellation of Actual (LOR1) condition in the NSW region - 18/05/2024
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No. 116688 is cancelled at 1840 hrs 18/05/2024.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 18/05/2024
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 18/05/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs
The capacity reserve requirement is 1430 MW
The minimum capacity reserve available is 1314 MW
Manager NEM Real Time Operations