Filter by category
Filter by Date
[EventId:202404301730_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 30 April 2024 17:30
Issued by Australian Energy Market Operator Ltd at 1730 hrs on 30 April 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 30 April 2024.
Refer to market notice: 116390
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1730 hrs on 30 April 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202404301630_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 30 April 2024 16:30
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 30 April 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 30 April 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1630 hrs on 30 April 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
Planned outage of Gordon - Chapel St No. 1 220 kV line in the TAS region on 26/04/2024
The Gordon - Chapel St No. 1 220 kV line in the Tasmania (TAS) region is planned to be out of service from 1030 hrs on 26/04/2024 to 1500 hrs on 26/04/2024
A credible contingency event during this planned outage could cause a large reduction in generation in TAS.
Refer AEMO Network Outage Schedule (NOS) for further details.
Manager NEM Real Time Operations
[EventId:202404201300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 20 April 2024 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 20 April 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 20 April 2024.
Refer to market notice: 116210
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 20 April 2024.
This is an AEMO autogenerated Market Notice.
[EventId:202404201205_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 20 April 2024 12:05
Issued by Australian Energy Market Operator Ltd at 1205 hrs on 20 April 2024
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 20 April 2024.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1205 hrs on 20 April 2024.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
SERVICE RESUMPTION- AEMO NEM Control Rooms BT Phones
SERVICE RESUMPTION - AEMO NEM Control Rooms BT Phones
Refer AEMO Electricity Market Notice 116127
AEMO advises participants that the service interruption relating to: AEMO NEM Control Rooms BT Phones has been resolved.
Participants may resume using the standard AEMO contact numbers.
Participants experiencing any further service issues should contact the AEMO Support Hub
Phone: 1300236600 Opt1
Email: supporthub@aemo.com.au
Manager NEM Real Time Operations
SERVICE INTERRUPTION - AEMO NEM Control Rooms BT Phones
SERVICE INTERRUPTION - AEMO NEM Control Rooms BT Phones
AEMO is experiencing a service interruption relating to: NEM Control Room Primary BT Phone services
Primary phone communication in and out of the NEM Control Rooms are currently unavailable.
AEMO is working on restoring the service. AEMO Support Hub will provide updates as more information becomes available.
Participants are requested to contact the AEMO Electricity Control Room via backup means.
For further enquiries please contact the AEMO Support Hub
Phone: 1300236600 Opt1
Email: supporthub@aemo.com.au]
Manager NEM Real Time Operations
Fast Frequency Response Market - Increase in R1 and L1 FCAS dispatch caps from 15 April 2024
Following review of the operation of the Very Fast FCAS market, from 1300 hrs AEST on Monday 15 April AEMO will:
Increase the cap on dispatch of Very Fast Raise (R1) Contingency FCAS from 250 MW to 325 MW
Increase the cap on dispatch of Very Fast Lower (L1) Contingency FCAS from 125 MW to 200 MW
No other changes to the dispatch of Very Fast FCAS or FCAS constraint equation changes will be made on this date.
For information on the Fast Frequency Response (FFR) initiative please visit the website at: https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response
Andrew Groom
AEMO Operations
Increase to QNI limit to next hold point of 850 MW NSW to Qld
Refer to market notices 114742.
AEMO, TransGrid, Powerlink have reviewed the test results following the QNI minor testing on 15th February 2024. The next hold point can now be released.
The hold point of 850 MW from NSW to Qld will be implemented as of 1000 hrs 10th April 2024.
Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade
Ben Blake
AEMO Operations