STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 27/11/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120867 has been updated at 0430 hrs 24/11/2024 to the following:
[1.] From 1000 hrs 27/11/2024 to 1300 hrs 27/11/2024.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 0 MW.
[2.] From 1830 hrs 27/11/2024 to 2300 hrs 27/11/2024.
The forecast capacity reserve requirement is 1078 MW.
The minimum capacity reserve available is 0 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 26/11/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120866 has been updated at 0430 hrs 24/11/2024 to the following:
[1.] From 1400 hrs 26/11/2024 to 2300 hrs 26/11/2024.
The forecast capacity reserve requirement is 1152 MW.
The minimum capacity reserve available is 366 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/11/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 120857 has been updated at 1700 hrs 23/11/2024 to the following:
[1.] From 1700 hrs 27/11/2024 to 2000 hrs 27/11/2024.
The forecast capacity reserve requirement is 737 MW.
The minimum capacity reserve available is 288 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 27/11/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120856 has been updated at 1700 hrs 23/11/2024 to the following:
[3.] From 1030 hrs 27/11/2024 to 1300 hrs 27/11/2024.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 0 MW.
[4.] From 1700 hrs 27/11/2024 to 2100 hrs 27/11/2024.
The forecast capacity reserve requirement is 1078 MW.
The minimum capacity reserve available is 0 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 26/11/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120855 has been updated at 1700 hrs 23/11/2024 to the following:
[2.] From 1400 hrs 26/11/2024 to 2030 hrs 26/11/2024.
The forecast capacity reserve requirement is 1038 MW.
The minimum capacity reserve available is 559 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/11/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120854 has been updated at 1700 hrs 23/11/2024 to the following:
[1.] From 1530 hrs 25/11/2024 to 1800 hrs 25/11/2024.
The forecast capacity reserve requirement is 1142 MW.
The minimum capacity reserve available is 852 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/11/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 120830 has been updated at 0940 hrs 23/11/2024 to the following:
[1.] From 1500 hrs 27/11/2024 to 2100 hrs 27/11/2024.
The forecast capacity reserve requirement is 525 MW.
The minimum capacity reserve available is 0 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 27/11/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120850 has been updated at 0925 hrs 23/11/2024 to the following:
[1.] From 1100 hrs 27/11/2024 to 1400 hrs 27/11/2024.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 0 MW.
[2.] From 1500 hrs 27/11/2024 to 1530 hrs 27/11/2024.
The forecast capacity reserve requirement is 708 MW.
The minimum capacity reserve available is 0 MW.
[3.] From 1830 hrs 27/11/2024 to 2030 hrs 27/11/2024.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 0 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 26/11/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120849 has been updated at 0920 hrs 23/11/2024 to the following:
From 1630 hrs 26/11/2024 to 1730 hrs 26/11/2024.
The forecast capacity reserve requirement is 960 MW.
The minimum capacity reserve available is 861 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations