Market Notices

115641PRICES UNCHANGED15/03/2024 12:34:45 PM

[EventId:202403151230_confirmed] Prices for interval 15-Mar-2024 12:30 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1230 hrs on 15 March 2024

PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2024 12:30.

In accordance with Market Notice 115636 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
115640PRICES UNCHANGED15/03/2024 12:33:54 PM

[EventId:202403151225_confirmed] Prices for interval 15-Mar-2024 12:25 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1230 hrs on 15 March 2024

PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2024 12:25.

In accordance with Market Notice 115635 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
115639PRICES UNCHANGED15/03/2024 12:32:53 PM

[EventId:202403151220_confirmed] Prices for interval 15-Mar-2024 12:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1230 hrs on 15 March 2024

PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2024 12:20.

In accordance with Market Notice 115634 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
115638PRICES UNCHANGED15/03/2024 12:30:22 PM

[EventId:202403151215_confirmed] Prices for interval 15-Mar-2024 12:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1230 hrs on 15 March 2024

PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2024 12:15.

In accordance with Market Notice 115633 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
115637PRICES UNCHANGED15/03/2024 12:31:39 PM

[EventId:202403151205_confirmed] Prices for interval 15-Mar-2024 12:05 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1230 hrs on 15 March 2024

PRICES ARE NOW CONFIRMED for trading interval 15-Mar-2024 12:05.

In accordance with Market Notice 115631 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
115624POWER SYSTEM EVENTS14/03/2024 11:47:59 PM

Non-credible contingency event - SA region - 14/03/2024

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - SA region - 14/03/2024

At 2307 hrs the Tungkillo - Robertstown No. 1 275 kV Line and the Tungkillo East 275 kV Bus tripped.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
115611GENERAL NOTICE13/03/2024 11:54:44 AM

Fast Frequency Response Market - Increase in R1 FCAS dispatch cap from 18 March 2024.

AEMO ELECTRICITY MARKET NOTICE

Following review of the operation of the Very Fast FCAS market, from 1300 hrs AEST on Monday 18 March AEMO will:

Increase the cap on dispatch of Very Fast Raise (R1) Contingency FCAS from 225 MW to 250 MW

Retain the existing cap on dispatch of Very Fast Lower (L1) Contingency FCAS at 125 MW

No other changes to the dispatch of Very Fast FCAS or FCAS constraint equation changes will be made on this date.

For information on the Fast Frequency Response (FFR) initiative please visit the website at: https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response

Andrew Groom
AEMO Operations
115595POWER SYSTEM EVENTS12/03/2024 03:29:42 AM

Non-credible contingency event - QLD region - 12/03/2024

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - QLD region - 12/03/2024

At 0249 hrs the Strathmore - Clare South No 7208 132KV Line opened at Strathmore end only.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
115591GENERAL NOTICE11/03/2024 10:33:02 AM

NEM Local Temperature Alerts for SA, VIC from 11 Mar 2024 to 15 Mar 2024

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.

SA
Adelaide West Terrace (39+ Deg C): 11th Mar
Mt Gambier Ap (39+ Deg C): 11th Mar
Port Augusta Ap (39+ Deg C): 11th Mar, 12th Mar, 13th Mar

VIC
Mildura Ap (39+ Deg C): 12th Mar

The NEM Local Temperature Alert Levels are:

Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.

AEMO requests Market Participants to:

1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,

2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.

Further information is available at:

https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts

AEMO Operations Planning
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm