Market Notices

121009RESERVE NOTICE26/11/2024 04:56:18 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 26/11/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 26/11/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1630 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs

The capacity reserve requirement is 1450 MW
The minimum capacity reserve available is 886 MW

Manager NEM Real Time Operations
     
121008POWER SYSTEM EVENTS26/11/2024 04:55:00 PM

Non-credible contingency event - NSW region - 26/11/2024

AEMO ELECTRICITY MARKET NOTICE.

Non-credible contingency event - NSW region - 26/11/2024

At 1637 hrs Uranquinty Unit 12 tripped and at 1639 hrs Uranquinty Units 11 and 13 tripped.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.

Manager NEM Real Time Operations
     
121007RESERVE NOTICE26/11/2024 04:53:53 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 120972 is cancelled at 16:50 hrs 26/11/2024.

No LOR2 condition is currently forecast in the STPASA period.

Manager NEM Real Time Operations
     
121006RESERVE NOTICE26/11/2024 03:53:47 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120981 has been updated at 1550 hrs to the following:

[1.] From 1630 hrs 26/11/2024 to 1930 hrs 26/11/2024.
The forecast capacity reserve requirement is 1380 MW.
The minimum capacity reserve available is 989 MW.

Manager NEM Real Time Operations
     
121005RESERVE NOTICE26/11/2024 03:44:54 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 26/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120984 is cancelled at 1545 hrs 26/11/2024.

Manager NEM Real Time Operations
     
120995RESERVE NOTICE26/11/2024 04:03:12 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 29/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120923 has been updated at 1400 hrs 26/11/2024 to the following:

1. From 0000 hrs 29/11/2024 to 0030 hrs 29/11/2024.
The forecast capacity reserve requirement is 1705 MW.
The minimum capacity reserve available is 1456 MW.

2. From 1230 hrs 29/11/2024 to 1300 hrs 29/11/2024.
The forecast capacity reserve requirement is 1538 MW.
The minimum capacity reserve available is 1502 MW.

3. From 1530 hrs 29/11/2024 to 1800 hrs 29/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 846 MW.


AEMO Operations
     
120993RESERVE NOTICE26/11/2024 04:06:01 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120922 has been updated at 1400 hrs 26/11/2024 to the following:

1. From 0500 hrs 28/11/2024 to 0600 hrs 28/11/2024.
The forecast capacity reserve requirement is 1829 MW.
The minimum capacity reserve available is 1731 MW.

2. From 2300 hrs 28/11/2024 to 2359 hrs 28/11/2024.
The forecast capacity reserve requirement is 1712 MW.
The minimum capacity reserve available is 1231 MW.


AEMO Operations
     
120991RESERVE NOTICE26/11/2024 04:07:07 PM

STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 120925 has been updated at 1400 hrs 26/11/2024 to the following:

1. From 1500 hrs 28/11/2024 to 1530 hrs 28/11/2024.
The forecast capacity reserve requirement is 881 MW.
The minimum capacity reserve available is 867 MW.

2. From 1630 hrs 28/11/2024 to 2030 hrs 28/11/2024.
The forecast capacity reserve requirement is 1234 MW.
The minimum capacity reserve available is 968 MW.


AEMO Operations
     
120989RESERVE NOTICE26/11/2024 04:08:09 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 29/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120978 has been updated at 1500 hrs 26/11/2024 to the following:

From 0630 hrs to 1500 hrs 29/11/2024.
The forecast capacity reserve requirement is 1421 MW.
The minimum capacity reserve available is 1200 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     