Filter by category
Filter by Date
Cancellation: Direction issued to: EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Cancellation: Direction issued to: EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Refer to Market Notice 120474
Direction is cancelled from: 0800 hrs 15/11/2024
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0800 hrs 15/11/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Thursday, 14 November 2024
NON-CONFORMANCE QLD1 Region Thursday, 14 November 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 14/11/2024 08:40 to 14/11/2024 12:00
Amount: 30 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer AEMO Electricity Participant Notice 120381
The TORRB4 TORRENS ISLAN direction is now expected to stay in place until 1800 hrs 14/11/2024.
The direction update is issued at 0950 hrs 14/11/2024.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Thursday, 14 November 2024
NON-CONFORMANCE QLD1 Region Thursday, 14 November 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_1
Duration: 14/11/2024 08:05 to 14/11/2024 08:10
Amount: -47 MW
Constraint: NC-Q_MPP_1
Auto-generated on behalf of Manager NEM Real Time Operations
Direction - VIC region to Snowy Hydro Limited - MURR2-3 MURRAY2
Direction - VIC region to Snowy Hydro Limited - MURR2-3 MURRAY2
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Snowy Hydro Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Snowy Hydro Limited - MURR2-3 MURRAY2 at 0900 hrs 14/11/2024
Type of resource: generating unit operating as synchronous condenser
Required actions: Synchronise and operate as a synchronous condenser at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024
Snowy Hydro Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - VIC region to Snowy Hydro Limited - MURR2-2 MURRAY2
Direction - VIC region to Snowy Hydro Limited - MURR2-2 MURRAY2
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Snowy Hydro Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Snowy Hydro Limited - MURR2-2 MURRAY2 at 0900 hrs 14/11/2024
Type of resource: generating unit operating as synchronous condenser
Required actions: Synchronise and operate as a synchronous condenser at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024.
Snowy Hydro Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to EnergyAustralia Ecogen Pty Ltd. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: EnergyAustralia Ecogen Pty Ltd - JLB02 JEERALANG B PO at 0900 hrs 14/11/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024.
EnergyAustralia Ecogen Pty Ltd does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Direction - VIC region to EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO
Refer to Market Notice 120404
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to EnergyAustralia Ecogen Pty Ltd. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: EnergyAustralia Ecogen Pty Ltd - JLB01 JEERALANG B PO at 0900 hrs 14/11/2024
Type of resource: generating unit
Required actions: Synchronise and follow dispatch targets at 0930 hrs 14/11/2024
Services provided: System Strength
Circumstances necessitating the Direction:System Strength
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 1500 hrs 14/11/2024.
EnergyAustralia Ecogen Pty Ltd does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations