Filter by category
Filter by Date
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 10/03/2024
The Forecast LOR1 condition in the VIC region advised in AEMO Electricity Market Notice No. 115569 is cancelled at 2310 hrs 09/03/2024.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/03/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 115568 is cancelled at 2310 hrs 09/03/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the VIC Region on 10/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the VIC region for the following Period:
[1.] From 1830 hrs 10/03/2024 to 1900 hrs 10/03/2024.
The forecast capacity reserve requirement is 1130 MW.
The minimum capacity reserve available is 1075 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1830 hrs 10/03/2024 to 1900 hrs 10/03/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 575 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/03/2024
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 115566 is cancelled at 1940 hrs 09/03/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 10/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1830 hrs 10/03/2024 to 1900 hrs 10/03/2024.
The forecast capacity reserve requirement is 600 MW.
The minimum capacity reserve available is 599 MW.
Manager NEM Real Time Operations
Cancellation of Reclassification of a Non-Credible Contingency Event: Tully - Cardwell No.7389 132 kV Line and Ross - Woree No. 8905 275 kV Line
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD1
Lines: Tully - Cardwell No.7389 132 kV Line and Ross - Woree No. 8905 275 kV Line
Cancellation time: 09/03/2024 17:40
Constraint set(s) revoked: Nil
Refer AEMO Electricity Market Notice 115550
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/03/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1800 hrs 14/03/2024 to 1830 hrs 14/03/2024.
The forecast capacity reserve requirement is 1780 MW.
The minimum capacity reserve available is 1493 MW.
Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Tully - Cardwell No.7389 132 kV line and Ross - Woree No. 8905 275 kV line
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly, AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Tully - Cardwell No.7389 132 kV line and Ross - Woree No. 8905 275 kV line
Duration: 09/03/2024 13:55 until further notice
Constraint set(s) invoked: NONE
Manager NEM Real Time Operations