Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer AEMO Electricity Participant Notice 119150
The TORRB4 TORRENS ISLAN direction is now expected stay in place until 1500 hrs 22/10/2024.
The direction update is issued at 1430 hrs 22/10/2024.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 20/10/2024
Cancellation - AEMO Intervention Event - SA region 20/10/2024
Refer to Market Notice 119108
The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 22/10/2024.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB4 TORRENS ISLAN
Refer to Market Notice 119192
Direction is cancelled from: 1500 hrs 22/10/2024
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 119149
Direction is cancelled from: 1430 hrs 22/10/2024
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0800 hrs 23/10/2024.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 24/10/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 119182 is cancelled at 1200 hrs 22/10/2024.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 24/10/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1730 hrs to 1930 hrs 24/10/2024.
The forecast capacity reserve requirement is 862 MW.
The minimum capacity reserve available is 611 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 24/10/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 119180 is cancelled at 0830 hrs 22/10/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 24/10/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1900 hrs 24/10/2024 to 2100 hrs 24/10/2024.
The forecast capacity reserve requirement is 1367 MW.
The minimum capacity reserve available is 1344 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations