Filter by category
Filter by Date
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 19/06/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 117038 has been updated at 0900 hrs 18/06/2024 to the following:
From 1700 hrs to 2030 hrs 19/06/2024.
The forecast capacity reserve requirement is 1190 MW.
The minimum capacity reserve available is 789 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 19/06/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 117035 has been updated at 0840 hrs 18/06/2024 to the following:
[1.] From 1730 hrs 19/06/2024 to 2000 hrs 19/06/2024.
The forecast capacity reserve requirement is 1114 MW.
The minimum capacity reserve available is 812 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM RTO
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region beginning on 20/06/2024
The Forecast LOR2 condition in the NSW region for 20/06/2024 advised in AEMO Electricity Market Notice No. 117034 has been updated at 0540 hrs 18/06/2024 to the following:
[1.] From 0600 hrs 20/06/2024 to 0930 hrs 20/06/2024.
The forecast capacity reserve requirement is 1203 MW.
The minimum capacity reserve available is 848 MW.
[2.] From 1530 hrs 20/06/2024 to 0100 hrs 21/06/2024.
The forecast capacity reserve requirement is 1256 MW.
The minimum capacity reserve available is 781 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region beginning on 19/06/2024
The Forecast LOR2 condition in the NSW region for 19/06/2024 advised in AEMO Electricity Market Notice No. 117034 has been updated at 0540 hrs 18/06/2024 to the following:
[1.] From 0630 hrs 19/06/2024 to 0830 hrs 19/06/2024.
The forecast capacity reserve requirement is 1061 MW.
The minimum capacity reserve available is 833 MW.
[2.] From 1600 hrs 19/06/2024 to 0000 hrs 20/06/2024.
The forecast capacity reserve requirement is 1073 MW.
The minimum capacity reserve available is 719 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region beginning on 19/06/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 0530 hrs 19/06/2024 to 0900 hrs 19/06/2024.
The forecast capacity reserve requirement is 1050 MW.
The minimum capacity reserve available is 712 MW.
[2.] From 1600 hrs 19/06/2024 to 0130 hrs 20/06/2024.
The forecast capacity reserve requirement is 1082 MW.
The minimum capacity reserve available is 592 MW.
[3.] From 0530 hrs 20/06/2024 to 1000 hrs 20/06/2024.
The forecast capacity reserve requirement is 1250 MW.
The minimum capacity reserve available is 674 MW.
[4.] From 1600 hrs 20/06/2024 to 0100 hrs 21/06/2024.
The forecast capacity reserve requirement is 1253 MW.
The minimum capacity reserve available is 591 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Monday, 17 June 2024
NON-CONFORMANCE QLD1 Region Monday, 17 June 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 17/06/2024 04:30 to 17/06/2024 05:25
Amount: -51 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Collinsville North - Proserpine No.7125 132 kV line and Collinsville North - Proserpine No.7126 132 kV line in QLD1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: QLD1
Lines: Collinsville North - Proserpine No.7125 132 kV and Collinsville North - Proserpine No.7126 132 kV
Cancellation time: 11/06/2024 23:09
Constraint set(s) revoked:
NONE
Refer AEMO Electricity Market Notice 116964
Auto-generated on behalf of Manager NEM Real Time Operations
Reclassification of a Non-Credible Contingency Event: Collinsville North - Proserpine No.7125 132 kV line and Collinsville North - Proserpine No.7126 132 kV line in QLD1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: QLD1
Lines: Collinsville North - Proserpine No.7125 132 kV and Collinsville North - Proserpine No.7126 132 kV
Duration: 11/06/2024 22:07 until further notice
Constraint set(s) invoked:
NONE
Auto-generated on behalf of Manager NEM Real Time Operations
Cancellation of a Non-Credible Contingency Event: Farrell - Reece No.1 220 kV line and Farrell - Reece No.2 220 kV line in TAS1 due to Lightning.
Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.
Region: TAS1
Lines: Farrell - Reece No.1 220 kV and Farrell - Reece No.2 220 kV
Cancellation time: 11/06/2024 17:36
Constraint set(s) revoked:
F-T-FARE_N-2 Constraint set contains the following interconnector(s) on the left hand side:
T-V-MNSP1
Refer AEMO Electricity Market Notice 116947
Auto-generated on behalf of Manager NEM Real Time Operations