Filter by category
Filter by Date
[EventId:202412061425_confirmed] Prices for interval 06-Dec-2024 14:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1450 hrs on 6 December 2024
PRICES ARE NOW CONFIRMED for trading interval 06-Dec-2024 14:25.
In accordance with Market Notice 121505 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/12/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1730 hrs 06/12/2024 to 1830 hrs 06/12/2024.
The forecast capacity reserve requirement is 1724 MW.
The minimum capacity reserve available is 1675 MW.
Manager NEM Real Time Operations
[EventId:202412051310_confirmed] Prices for interval 05-Dec-2024 13:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 5 December 2024
PRICES ARE NOW CONFIRMED for trading interval 05-Dec-2024 13:10.
In accordance with Market Notice 121477 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412051330_confirmed] Prices for interval 05-Dec-2024 13:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 5 December 2024
PRICES ARE NOW CONFIRMED for trading interval 05-Dec-2024 13:30.
In accordance with Market Notice 121481 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412051325_confirmed] Prices for interval 05-Dec-2024 13:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 5 December 2024
PRICES ARE NOW CONFIRMED for trading interval 05-Dec-2024 13:25.
In accordance with Market Notice 121480 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412051320_confirmed] Prices for interval 05-Dec-2024 13:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 5 December 2024
PRICES ARE NOW CONFIRMED for trading interval 05-Dec-2024 13:20.
In accordance with Market Notice 121479 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412051315_confirmed] Prices for interval 05-Dec-2024 13:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 5 December 2024
PRICES ARE NOW CONFIRMED for trading interval 05-Dec-2024 13:15.
In accordance with Market Notice 121478 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202412051305_confirmed] Prices for interval 05-Dec-2024 13:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 5 December 2024
PRICES ARE NOW CONFIRMED for trading interval 05-Dec-2024 13:05.
In accordance with Market Notice 121475 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
NEM Local Temperature Alerts for SA, VIC from 05 Dec 2024 to 09 Dec 2024
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Adelaide West Terrace (39+ Deg C): 5th Dec
Port Augusta Ap (39+ Deg C): 5th Dec
VIC
Mildura Ap (39+ Deg C): 6th Dec
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning