123214MARKET INTERVENTION14/01/2025 04:04:54 PM

Direction - SA region 14/01/2025

AEMO ELECTRICITY MARKET NOTICE

Direction - SA region 14/01/2025

In accordance with section 116 of the National Electricity Law, AEMO has issued a direction to a participant in the SA region. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

The issue of the direction commences an AEMO intervention event. AEMO declares all trading intervals during the event to be intervention trading intervals, commencing from the interval ending 1605 hrs on 14/01/2025.

Intervention pricing does not apply to this AEMO intervention event.

AEMO may issue or revoke additional directions in order to meet the current requirement, unless sufficient market response is provided. A further market notice will be issued when all directions related to this requirement have been cancelled.


Manager NEM Real Time Operations
     
123213MARKET INTERVENTION14/01/2025 03:29:29 PM

Update - Foreseeable AEMO intervention in SA region

AEMO ELECTRICITY MARKET NOTICE

Update - Foreseeable AEMO intervention in SA region

Refer AEMO Electricity Market Notice 123201

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0130 hrs 15/01/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

AEMO estimates that, in the absence of sufficient market response by 1600 hrs 14/01/2025, AEMO may need to intervene by issuing a direction.

Manager NEM Real Time Operations
     
123206RESERVE NOTICE14/01/2025 01:49:41 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:

[1.] From 1630 hrs 15/01/2025 to 1830 hrs 15/01/2025.
The forecast capacity reserve requirement is 1720 MW.
The minimum capacity reserve available is 1570 MW.

Manager NEM Real Time Operations
     
123201MARKET INTERVENTION14/01/2025 01:09:01 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0130 hrs 15/01/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
123178RESERVE NOTICE13/01/2025 06:15:43 PM

Cancellation of Actual (LOR2) condition in the NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the NSW region - 13/01/2025

The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.123176 is cancelled at 1815 hrs 13/01/2025.

Manager NEM Real Time Operations
     
123176RESERVE NOTICE13/01/2025 05:49:35 PM

Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 13/01/2025

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs

The capacity reserve required is 714 MW
The minimum reserve available is 560 MW

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement a AEMO intervention event.

Manager NEM Real Time Operations
     
123167RESERVE NOTICE13/01/2025 04:33:47 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 123157 has been updated at 1630 hrs to the following:


[1.] From 1630 hrs 13/01/2025 to 1700 hrs 13/01/2025.
The forecast capacity reserve requirement is 1372 MW.
The minimum capacity reserve available is 1061 MW.

[2.] From 1900 hrs 13/01/2025 to 2000 hrs 13/01/2025.
The forecast capacity reserve requirement is 1603 MW.
The minimum capacity reserve available is 1214 MW.


Manager NEM Real Time Operations
     
123160MARKET INTERVENTION13/01/2025 03:11:55 PM

Cancellation - AEMO Intervention Event - SA region 12/01/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 12/01/2025

Refer to Market Notice 123112

The AEMO Intervention Event and all associated directions are cancelled from 1500 hrs on 13/01/2025.


Manager NEM Real Time Operations
     
123159MARKET INTERVENTION13/01/2025 03:10:02 PM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 123113

Direction is cancelled from: 1500 hrs 13/01/2025

Manager NEM Real Time Operations
     
X