Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 124240
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0730 hrs 06/02/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1500 hrs 06/02/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 11/02/2025
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 124094 is cancelled at 1400 hrs 06/02/2025.
No LOR condition is currently forecast in the STPASA period.
AEMO Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 07/02/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 124184 is cancelled at 1400 hrs 06/02/2025.
No LOR condition is currently forecast in the PDPASA period.
AEMO Operations
Cancellation - AEMO Intervention Event - SA region 06/02/2025
Cancellation - AEMO Intervention Event - SA region 06/02/2025
Refer to Market Notice 124204
The AEMO Intervention Event and all associated directions are cancelled from 1300 hrs on 06/02/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 124182
Direction is cancelled from: 1300 hrs 06/02/2025
Manager NEM Real Time Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0730 hrs 07/02/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/02/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 124225 is cancelled at 0840 hrs 06/02/2025.
Manager NEM Real Time Operations
Cancellation - AEMO Intervention Event - SA region 04/02/2025
Cancellation - AEMO Intervention Event - SA region 04/02/2025
Refer to Market Notice 124097
The AEMO Intervention Event and all associated directions are cancelled from 0400 hrs on 06/02/2025.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 124095
Direction is cancelled from: 0400 hrs 06/02/2025
Manager NEM Real Time Operations