Inter-regional transfer limit variation - constraint automation to manage Power System Security in SA region - 15/03/2024
Inter-regional transfer limit variation - constraint automation to manage Power System Security in SA region - 15/03/2024
At 0600 hrs 15/03/2024 there was a short notice outage of Robertstown - Tungkillo No. 2 275 kV Line.
At 0615 hrs 15/03/2024 there was a short notice outage of Tungkillo - Para No. 1 275 kV Line.
In order to maintain the power system in a secure operating state in the SA region, AEMO has invoked the following automated constraint sets.
CA_SYDS_5505DC4C from 06:00 hrs until further notice
These constraint sets contains equations with the following interconnector on the LHS;
V-S-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - constraint automation to manage Power System Security in SA region - 15/03/2024
Inter-regional transfer limit variation - constraint automation to manage Power System Security in SA region - 15/03/2024
In order to maintain the power system in a secure operating state in the SA region, AEMO has invoked the following automated constraint sets.
CA_SYDS_5505D0BC from 04:40 hrs to 05:10 hrs
CA_SYDS_5505D516 from 04:55 hrs to 05:10 hrs
These constraint sets contains equations with the following interconnector on the LHS;
V-S-MNSP1,V-SA
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Robertstown - Tungkillo No. 1 275 kV Line - SA region - 14/03/2024
Inter-regional transfer limit variation - Robertstown - Tungkillo No. 1 275 kV Line - SA region - 14/03/2024
At 2307 hrs 14/03/2024 there was an unplanned outage of Robertstown - Tungkillo No. 1 275 kV Line.
The following constraint set(s) invoked at 2315 hrs 14/03/2024
S-RBTU
This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1,V-SA
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Lismore 132kV SVC - NSW region - 14/03/2024
Inter-regional transfer limit variation - Lismore 132kV SVC - NSW region - 14/03/2024
At 0800 hrs 14/03/2024 there was a short notice outage of Lismore 132kV SVC.
The following constraint set(s) invoked at 0800 hrs 14/03/2024
N-LS_VC1
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Fast Frequency Response Market - Increase in R1 FCAS dispatch cap from 18 March 2024.
Following review of the operation of the Very Fast FCAS market, from 1300 hrs AEST on Monday 18 March AEMO will:
Increase the cap on dispatch of Very Fast Raise (R1) Contingency FCAS from 225 MW to 250 MW
Retain the existing cap on dispatch of Very Fast Lower (L1) Contingency FCAS at 125 MW
No other changes to the dispatch of Very Fast FCAS or FCAS constraint equation changes will be made on this date.
For information on the Fast Frequency Response (FFR) initiative please visit the website at: https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response
Andrew Groom
AEMO Operations
Cancellation of Actual (LOR1) condition in the SA region - 11/03/2024
Cancellation of Actual (LOR1) condition in the SA region - 11/03/2024
The Actual LOR1 Condition in the SA Region advised in AEMO Electricity Market Notice No.115593 is cancelled at 1945 hrs 11/03/2024.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 11/03/2024
Actual Lack Of Reserve Level 1 (LOR1) in the SA region - 11/03/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1830 hrs.
The Actual LOR1 condition is forecast to exist until 2030 hrs
The capacity reserve requirement is 498 MW
The minimum capacity reserve available is 255 MW
Manager NEM Real Time Operations
NEM Local Temperature Alerts for SA, VIC from 11 Mar 2024 to 15 Mar 2024
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Adelaide West Terrace (39+ Deg C): 11th Mar
Mt Gambier Ap (39+ Deg C): 11th Mar
Port Augusta Ap (39+ Deg C): 11th Mar, 12th Mar, 13th Mar
VIC
Mildura Ap (39+ Deg C): 12th Mar
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
Inter-regional transfer limit variation - South Pine SVC - QLD region - 08/03/2024
Inter-regional transfer limit variation - South Pine SVC - QLD region - 08/03/2024
At 1605 hrs 08/03/2024 there was an unplanned outage of South Pine SVC.
The following constraint set(s) invoked at 1610 hrs 08/03/2024
Q-SP_VC
This constraint set(s) contains equations with the following interconnectors on the LHS.
NSW1-QLD1,N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations