Filter by category
Filter by Date
[EventId:202502041330_confirmed] Prices for interval 04-Feb-2025 13:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 4 February 2025
PRICES ARE NOW CONFIRMED for trading interval 04-Feb-2025 13:30.
In accordance with Market Notice 124076 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502041325_confirmed] Prices for interval 04-Feb-2025 13:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 4 February 2025
PRICES ARE NOW CONFIRMED for trading interval 04-Feb-2025 13:25.
In accordance with Market Notice 124075 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502041320_confirmed] Prices for interval 04-Feb-2025 13:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 4 February 2025
PRICES ARE NOW CONFIRMED for trading interval 04-Feb-2025 13:20.
In accordance with Market Notice 124073 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502041315_confirmed] Prices for interval 04-Feb-2025 13:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 4 February 2025
PRICES ARE NOW CONFIRMED for trading interval 04-Feb-2025 13:15.
In accordance with Market Notice 124071 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502041305_confirmed] Prices for interval 04-Feb-2025 13:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1330 hrs on 4 February 2025
PRICES ARE NOW CONFIRMED for trading interval 04-Feb-2025 13:05.
In accordance with Market Notice 124068 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
CHG0101137 | Completed | Production | Planned Maintenance to Norwest Marketnet Site to Site VPN Router
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Local Area Network
Change Title: Planned Maintenance to Norwest Marketnet Site to Site VPN Router
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
[EventId:202502041300_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 04 February 2025 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 4 February 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 4 February 2025.
Refer to market notice: 124064
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.
The negative residue constraint NRM_VIC1_SA1 ceased operating at 1300 hrs on 4 February 2025.
This is an AEMO autogenerated Market Notice.
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 07/02/2025
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1700 hrs to 1830 hrs 07/02/2025.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 576 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
[EventId:202502041135_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 04 February 2025 11:35
Issued by Australian Energy Market Operator Ltd at 1135 hrs on 4 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 4 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.
The negative residue constraint set NRM_VIC1_SA1 commenced operating from 1135 hrs on 4 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.