Market Notices

122712PRICES UNCHANGED02/01/2025 10:33:23 AM

[EventId:202501021030_confirmed] Prices for interval 02-Jan-2025 10:30 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025

PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:30.

In accordance with Market Notice 122707 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122711PRICES UNCHANGED02/01/2025 10:32:03 AM

[EventId:202501021025_confirmed] Prices for interval 02-Jan-2025 10:25 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025

PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:25.

In accordance with Market Notice 122706 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122710PRICES UNCHANGED02/01/2025 10:37:01 AM

[EventId:202501021020_confirmed] Prices for interval 02-Jan-2025 10:20 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025

PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:20.

In accordance with Market Notice 122704 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122709PRICES UNCHANGED02/01/2025 10:30:26 AM

[EventId:202501021015_confirmed] Prices for interval 02-Jan-2025 10:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025

PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:15.

In accordance with Market Notice 122703 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122708PRICES UNCHANGED02/01/2025 10:35:53 AM

[EventId:202501021005_confirmed] Prices for interval 02-Jan-2025 10:05 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1030 hrs on 2 January 2025

PRICES ARE NOW CONFIRMED for trading interval 02-Jan-2025 10:05.

In accordance with Market Notice 122700 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
122701SETTLEMENTS RESIDUE02/01/2025 10:01:56 AM

[EventId:202501021000_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 02 January 2025 10:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1000 hrs on 2 January 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 January 2025.

Refer to market notice: 122698

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1000 hrs on 2 January 2025.

This is an AEMO autogenerated Market Notice.
     
122698SETTLEMENTS RESIDUE02/01/2025 08:00:24 AM

[EventId:202501020800_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 02 January 2025 08:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0800 hrs on 2 January 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 2 January 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 0800 hrs on 2 January 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
122696RECLASSIFY CONTINGENCY02/01/2025 05:39:25 AM

Cancellation of a Non-Credible Contingency Event: Guybal Munjan - Chalumbin 857 275kV line line and Guybal Munjan - Chalumbin 858 275kV line line in QLD1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits is no longer reasonably possible. There is no longer any lightning activity in the vicinity of the following lines. Accordingly its classification has reverted to a non-credible contingency event.

Region: QLD1

Lines: Guybal Munjan - Chalumbin 857 275kV line and Guybal Munjan - Chalumbin 858 275kV line

Cancellation time: 02/01/2025 05:39

Constraint set(s) revoked:
Q-RSCH_N-2 Constraint set contains the following interconnector(s) on the left hand side:
NONE


Refer AEMO Electricity Market Notice 122693

Auto-generated on behalf of Manager NEM Real Time Operations
     
122694RECLASSIFY CONTINGENCY02/01/2025 04:13:39 AM

Cancellation: Reclassification of non-credible contingency event due to existence of widespread abnormal condition/s - NEM regions.

AEMO ELECTRICITY MARKET NOTICE.

AEMO considers the occurrence of a non-credible contingency event due to the widespread abnormal conditions advised in AEMO Electricity Market Notice 122691 (Severe Space Weather) is no longer reasonably possible and accordingly its classification has reverted to non-credible.

Cancellation time: 0410 hrs 02/01/2025.

Manager NEM Real Time Operations
     