121089RESERVE NOTICE27/11/2024 02:48:34 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 27/11/2024

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1430 hrs.

The Actual LOR1 condition is forecast to exist until 1630 hrs.

The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 710 MW.

Manager NEM Real Time Operations
     
121088RESERVE NOTICE27/11/2024 03:18:10 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 03/12/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:

From 1530 hrs to 1900 hrs 03/12/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 963 MW.


AEMO Operations
     
121087RESERVE NOTICE27/11/2024 02:34:55 PM

PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 121064 has been updated at 1430 hrs to the following:

[1.] From 1700 hrs 28/11/2024 to 1900 hrs 28/11/2024.
The forecast capacity reserve requirement is 1250 MW.
The minimum capacity reserve available is 755 MW.

Manager NEM Real Time Operations
     
121083MARKET INTERVENTION27/11/2024 02:18:44 PM

Direction - NSW region to Munmorah Battery ProjectCo Pty Ltd - WARATAHBESS1

AEMO ELECTRICITY MARKET NOTICE

Direction - NSW region to Munmorah Battery ProjectCo Pty Ltd - WARATAHBESS1

Refer to Market Notice 121070


In accordance with clause 4.8.9(a)(1) of the National Electricity Rules, AEMO is issuing a direction to Munmorah Battery ProjectCo Pty Ltd. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).

Direction issued to: Munmorah Battery ProjectCo Pty Ltd - WARATAHBESS1 at 1415 hrs 27/11/2024
Type of resource: bi-directional unit
Required actions: Maintain 96 MWh Energy Storage Level and follow dispatch targets at 1500 hrs 27/11/2024
Services provided: Reserve
Circumstances necessitating the Direction: Reliability
Circumstances necessitating the Direction additional detail: intervention is required to maintain the reliability standard

Expected duration: 1900 hrs 27/11/2024.


Manager NEM Real Time Operations
     
121082RECLASSIFY CONTINGENCY27/11/2024 01:30:20 PM

Reclassification of a Non-Credible Contingency Event: Eildon PS - Mt Beauty No.1 220 kV line and Eildon PS - Mt Beauty No.2 220 kV line in VIC1 due to Lightning.

AEMO ELECTRICITY MARKET NOTICE

Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.

Region: VIC1

Lines: Eildon PS - Mt Beauty No.1 220 kV and Eildon PS - Mt Beauty No.2 220 kV

Duration: 27/11/2024 13:30 until further notice

Constraint set(s) invoked:
NONE

Auto-generated on behalf of Manager NEM Real Time Operations
     
121080PRICES UNCHANGED27/11/2024 01:21:31 PM

[EventId:202411271255_confirmed] Prices for interval 27-Nov-2024 12:55 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024

PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 12:55.

In accordance with Market Notice 121063 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
121079PRICES UNCHANGED27/11/2024 01:20:23 PM

[EventId:202411271315_confirmed] Prices for interval 27-Nov-2024 13:15 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024

PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 13:15.

In accordance with Market Notice 121072 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
121078PRICES UNCHANGED27/11/2024 01:19:10 PM

[EventId:202411271310_confirmed] Prices for interval 27-Nov-2024 13:10 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024

PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 13:10.

In accordance with Market Notice 121071 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
121077PRICES UNCHANGED27/11/2024 01:16:22 PM

[EventId:202411271305_confirmed] Prices for interval 27-Nov-2024 13:05 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1315 hrs on 27 November 2024

PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 13:05.

In accordance with Market Notice 121068 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.