113665RESERVE NOTICE23/01/2024 11:56:23 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 29/01/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1730 hrs to 2030 hrs 29/01/2024.
The forecast capacity reserve requirement is 520 MW.
The minimum capacity reserve available is 495 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113664RESERVE NOTICE23/01/2024 11:54:42 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 25/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113661 has been updated at 1100 hrs 23/01/2024 to the following:

From 1730 hrs to 2000 hrs 25/01/2024.
The forecast capacity reserve requirement is 738 MW.
The minimum capacity reserve available is 725 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113663RESERVE NOTICE23/01/2024 11:53:42 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113658 has been updated at 1100 hrs 23/01/2024 to the following:

From 1430 hrs 25/01/2024 to 2130 hrs 25/01/2024.
The forecast capacity reserve requirement is 1362 MW.
The minimum capacity reserve available is 622 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113661RESERVE NOTICE23/01/2024 10:47:26 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 25/01/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

From 1700 hrs to 2030 hrs 25/01/2024.
The forecast capacity reserve requirement is 725 MW.
The minimum capacity reserve available is 417 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113658RESERVE NOTICE23/01/2024 09:01:57 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113657 has been updated at 0800 hrs 23/01/2024 to the following:

From 1400 hrs to 2100 hrs 25/01/2024.
The forecast capacity reserve requirement is 1331 MW.
The minimum capacity reserve available is 366 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113657RESERVE NOTICE23/01/2024 08:05:20 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 113650 has been updated at 0700 hrs 23/01/2024 to the following:

From 1400 hrs to 2100 hrs 25/01/2024.
The forecast capacity reserve requirement is 1369 MW.
The minimum capacity reserve available is 586 MW

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
113656RESERVE NOTICE23/01/2024 06:34:03 AM

Update - STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No.113650 has been updated at 0600 hrs 23/01/2024 to the following:

[1.] From 1400 hrs 25/01/2024 to 2030 hrs 25/01/2024.
The forecast capacity reserve requirement is 1356 MW.
The minimum capacity reserve available is 594 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
113655RESERVE NOTICE23/01/2024 04:04:45 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the Qld Region on 25/01/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the Qld region advised in AEMO Electricity Market Notice No. 113651 is cancelled at 0330 hrs 23/01/2024

[No LOR2 condition is currently forecast in the STPASA period.]

Manager NEM Real TIme Operations
113654INTER-REGIONAL TRANSFER23/01/2024 03:30:39 AM

Inter-regional transfer limit variation - Hazelwood - South Morang No2 500 kV Line - VIC region - 23/01/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Hazelwood - South Morang No2 500 kV Line - VIC region - 23/01/2024

At 0318 hrs 23/01/2024 there was an unplanned outage of Hazelwood - South Morang No2 500 kV Line.

The following constraint set(s) invoked at 0325 hrs 23/01/2024
V-HWSM

This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1,V-S-MNSP1,V-SA,VIC1-NSW1

Refer to the AEMO Network Outage Scheduler for further information.