Filter by category
Filter by Date
NON-CONFORMANCE Region QLD1 Tuesday, 22 October 2024
NON-CONFORMANCE QLD1 Region Tuesday, 22 October 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: YABULU2
Duration: 22/10/2024 16:55 to 22/10/2024 17:05
Amount: -20 MW
Constraint: NC-Q_YABULU2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Tuesday, 22 October 2024
NON-CONFORMANCE NSW1 Region Tuesday, 22 October 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: RIVNB2
Duration: 22/10/2024 15:00 to 22/10/2024 15:05
Amount: 18 MW
Constraint: NC-N_RIVNB2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Tuesday, 22 October 2024
NON-CONFORMANCE NSW1 Region Tuesday, 22 October 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: DPNTB1
Duration: 22/10/2024 14:55 to 22/10/2024 15:05
Amount: 9 MW
Constraint: NC-N_DPNTB1
Auto-generated on behalf of Manager NEM Real Time Operations
CHG0098837 | Completed | Pre-Production | EMMS-Pre-Production Bay transfer for Core switch Refresh
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Electricity Market Management System_PreProd
Change Title: EMMS-Pre-Production Bay transfer for Core switch Refresh
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 24/10/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 119182 is cancelled at 1200 hrs 22/10/2024.
No LOR2 condition is currently forecast in the STPASA period.
AEMO Operations
CHG0098524 | Cancelled | Pre-Production | Maintenance activities to be performed on the Gas Short Term Trading Market Systems Pre-Production
Notification issued to: Market Notice
Notification Type: Cancelled
Change Type: Normal
Service/ Component: Short Term Trading Market (STTM)
Change Title: Maintenance activities to be performed on the Gas Short Term Trading Market Systems Pre-Production.
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 24/10/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:
From 1730 hrs to 1930 hrs 24/10/2024.
The forecast capacity reserve requirement is 862 MW.
The minimum capacity reserve available is 611 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
AEMO Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 24/10/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 119180 is cancelled at 0830 hrs 22/10/2024.
No LOR2 condition is currently forecast in the STPASA period.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 24/10/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1900 hrs 24/10/2024 to 2100 hrs 24/10/2024.
The forecast capacity reserve requirement is 1367 MW.
The minimum capacity reserve available is 1344 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations