Market Notices

117331INTER-REGIONAL TRANSFER10/07/2024 12:24:27 PM

Cancellation Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region).

AEMO ELECTRICITY MARKET NOTICE

Cancellation Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region).

Refer AEMO Electricity Market Notice 117330

AEMO has been notified that the controls to vary Directlink output are now available.

Constraint set I-CTRL_ISSUE_TE revoked at 1220 hrs.

Manager NEM Real Time Operations
117330INTER-REGIONAL TRANSFER10/07/2024 11:17:51 AM

Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Directlink control unavailable (NSW Region)

AEMO has been notified that the controls to vary Directlink output are unavailable until further notice.

Constraint set I-CTRL_ISSUE_TE invoked from 1120 hrs.

The constraint set contains equations with the following interconnector on the LHS:

N-Q-MNSP1


Manager NEM Real Time Operations
117329MARKET SYSTEMS09/07/2024 04:35:24 PM

CHG0091021 | Completed | Pre-Production | Pre-Prod MSATS 53.1.1 Patch Maintenance Release

Change Number: CHG0091021
Notification issued to: Market Notice

Notification Type: Completed
Change Type: Normal

Service/Component: MSATS - Consumer Administration and Transfer Solution(CATS)
Change Title: Pre-Prod MSATS 53.1.1 Patch Maintenance Release

Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
117328MARKET SYSTEMS09/07/2024 02:06:11 PM

CHG0090827 | Completed | Production | Identity Service Config Update in Production.

Change Number: CHG0090827
Notification issued to: Market Notice

Notification Type: Completed
Change Type: Normal

Service/Component: Identity Service (IDS)

Change Title: Identity Service Config Update in Production.

Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
117327MARKET SYSTEMS09/07/2024 10:17:28 AM

CHG0090827 | Production | Identity Service Config Update in Production.

Change Number: CHG0090827
Notification issued to: Market Notice
Notification Type: Initial

Change Type: Normal
Service/ Component: Identity Service (IDS)
Change Title: Identity Service Config Update in Production.

Change Start Date & Time: 09/07/2024 11:30:11 AEST
Change End Date & Time: 09/07/2024 13:30:22 AEST
Outage Start Date & Time:
Outage End Date & Time:

Environment: Production
Participant Impact and Requirements: Brief loss of redundancy might be noticed for users using Markets portal , between 12:30 PM and 13:00 PM.

Identity Service is used by the following systems:
*MSATS
*APIs (EMMS, GBB, MSATS)

Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any
planned/unplanned maintenance activities .
117325INTER-REGIONAL TRANSFER08/07/2024 08:01:41 PM

Inter-regional transfer limit variation - Eraring - Newcastle 90 330kV Line - NSW region - 08/07/2024

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Eraring - Newcastle 90 330kV Line - NSW region - 08/07/2024

At 1940 hrs 08/07/2024 there was an unplanned outage of Eraring - Newcastle 90 330kV Line

The following constraint set(s) invoked at 1950 hrs 08/07/2024
N-ERNC_90

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1,NSW1-QLD1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
117324LOAD RESTORE08/07/2024 09:58:40 PM

Cancellation - Load Restoration Direction in the NSW Region - 08/07/2024

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Load Restoration Direction in the NSW Region - 08/07/2024

Refer to AEMO Electricity Market Notice 117322
Load restoration as directed is complete. Direction cancelled from 2200 hrs 08/07/2024

Manager NEM Real Time Operations
117323INTER-REGIONAL TRANSFER08/07/2024 07:41:53 PM

Inter-Regional Transfer limit variation - Directlink - NSW Region

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Directlink - NSW Region

There has been an unplanned outage of all 3 cables of Directlink .

The following constraint set was invoked at 1845 hrs 08/07/2024

N-X_MBTE_3

The constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Refer AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
117322LOAD RESTORE08/07/2024 07:34:37 PM

Load Restoration Direction in the NSW Region

AEMO ELECTRICITY MARKET NOTICE

Load Restoration Direction in the NSW Region

AEMO has directed load restoration commencing at 1930 hrs 08/07/2024
in the NSW region

The direction was issued under section 116 of the NEL, and was a clause 4.8.9 instruction under the NER.