Update - STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No.113650 has been updated at 0600 hrs 23/01/2024 to the following:
[1.] From 1400 hrs 25/01/2024 to 2030 hrs 25/01/2024.
The forecast capacity reserve requirement is 1356 MW.
The minimum capacity reserve available is 594 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the Qld Region on 25/01/2024
The Forecast LOR2 condition in the Qld region advised in AEMO Electricity Market Notice No. 113651 is cancelled at 0330 hrs 23/01/2024
[No LOR2 condition is currently forecast in the STPASA period.]
Manager NEM Real TIme Operations
Inter-regional transfer limit variation - Hazelwood - South Morang No2 500 kV Line - VIC region - 23/01/2024
Inter-regional transfer limit variation - Hazelwood - South Morang No2 500 kV Line - VIC region - 23/01/2024
At 0318 hrs 23/01/2024 there was an unplanned outage of Hazelwood - South Morang No2 500 kV Line.
The following constraint set(s) invoked at 0325 hrs 23/01/2024
V-HWSM
This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1,V-S-MNSP1,V-SA,VIC1-NSW1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the Qld Region on 25/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the Qld region for the following period[s]:
[1.] From 1730 hrs 25/01/2024 to 1900 hrs 25/01/2024.
The forecast capacity reserve requirement is 819 MW.
The minimum capacity reserve available is 745 MW.
AEMO is seeking a market response.
Manager NEM Real Time operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 1400 hrs 25/01/2024 to 1700 hrs 25/01/2024.
The forecast capacity reserve requirement is 1306 MW.
The minimum capacity reserve available is 993 MW.
[2.] From 1730 hrs 25/01/2024 to 2000 hrs 25/01/2024.
The forecast capacity reserve requirement is 1202 MW.
The minimum capacity reserve available is 988 MW.
AEMO is seeking a market response.
Manager NEM Real Time operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113602 is cancelled at 1900 hrs 22/01/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 22/01/2024 to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 631 MW.
The minimum capacity reserve available is 583 MW.
AEMO is seeking a market response.
AEMO estimates the latest time at which it would need to intervene through an AEMO intervention event is 1430 hrs on 22/01/2024.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113596 is cancelled at 1040 hrs 22/01/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 22/01/2024 to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 599 MW.
The minimum capacity reserve available is 533 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.