Filter by category
Filter by Date
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the Qld Region on 25/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the Qld region for the following period[s]:
[1.] From 1730 hrs 25/01/2024 to 1900 hrs 25/01/2024.
The forecast capacity reserve requirement is 819 MW.
The minimum capacity reserve available is 745 MW.
AEMO is seeking a market response.
Manager NEM Real Time operations
STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 25/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 1400 hrs 25/01/2024 to 1700 hrs 25/01/2024.
The forecast capacity reserve requirement is 1306 MW.
The minimum capacity reserve available is 993 MW.
[2.] From 1730 hrs 25/01/2024 to 2000 hrs 25/01/2024.
The forecast capacity reserve requirement is 1202 MW.
The minimum capacity reserve available is 988 MW.
AEMO is seeking a market response.
Manager NEM Real Time operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113602 is cancelled at 1900 hrs 22/01/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 22/01/2024 to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 631 MW.
The minimum capacity reserve available is 583 MW.
AEMO is seeking a market response.
AEMO estimates the latest time at which it would need to intervene through an AEMO intervention event is 1430 hrs on 22/01/2024.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113596 is cancelled at 1040 hrs 22/01/2024.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:
[1.] From 1830 hrs 22/01/2024 to 1900 hrs 22/01/2024.
The forecast capacity reserve requirement is 599 MW.
The minimum capacity reserve available is 533 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
OR
Manager NEM Real Time Operations
NON-CONFORMANCE Region VIC1 Monday, 22 January 2024
NON-CONFORMANCE VIC1 Region Monday, 22 January 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: YWPS4
Duration: 22/01/2024 04:15 to 22/01/2024 05:10
Amount: 27 MW
Constraint: NC-V_YWPS4
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Sunday, 21 January 2024
NON-CONFORMANCE QLD1 Region Sunday, 21 January 2024
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 21/01/2024 17:20 to 21/01/2024 17:35
Amount: 34 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2024
The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 113550 is cancelled at 1520 hrs 21/01/2024.
Manager NEM Real Time Operations