120907RESERVE NOTICE25/11/2024 12:11:47 PM

STPASA - Update to the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120900 has been updated at 1100 hrs on 25/11/2024 to the following:

1. From 0800 hrs to 1000 hrs 28/11/2024.
The forecast capacity reserve requirement is 1259 MW.
The minimum capacity reserve available is 1253 MW.

2. From 1430 hrs to 1500 hrs 28/11/2024.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 573 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120906RESERVE NOTICE25/11/2024 12:10:34 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120899 has been updated at 1100 hrs on 25/11/2024 to the following:

1. From 1300 hrs to 1530 hrs 27/11/2024.
The forecast capacity reserve requirement is 1300 MW.
The minimum capacity reserve available is 23 MW.

2. From 1930 hrs to 2330 hrs 27/11/2024.
The forecast capacity reserve requirement is 1216 MW.
The minimum capacity reserve available is 0 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120905RESERVE NOTICE25/11/2024 12:12:41 PM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 26/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120901 has been updated at 1100 hrs on 25/11/2024 to the following:

From 1530 hrs to 1900 hrs 26/11/2024.
The forecast capacity reserve requirement is 1017 MW.
The minimum capacity reserve available is 561 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120901RESERVE NOTICE25/11/2024 09:12:38 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 26/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120881 has been updated at 0800 hrs 25/11/2024 to the following:

From 1500 hrs to 1930 hrs 26/11/2024.
The forecast capacity reserve requirement is 1167 MW.
The minimum capacity reserve available is 375 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120900RESERVE NOTICE25/11/2024 10:29:29 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120893 has been updated at 0800 hrs 25/11/2024 to the following:

From 0700 hrs to 0730 hrs 28/11/2024.
The forecast capacity reserve requirement is 1525 MW.
The minimum capacity reserve available is 1319 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120899RESERVE NOTICE25/11/2024 09:13:46 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120892 has been updated at 0800 hrs 25/11/2024 to the following:

1. From 1230 hrs to 1500 hrs 27/11/2024.
The forecast capacity reserve requirement is 1461 MW.
The minimum capacity reserve available is 0 MW.

2. From 2000 hrs to 2359 hrs 27/11/2024.
The forecast capacity reserve requirement is 1335 MW.
The minimum capacity reserve available is 0 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120898RESERVE NOTICE25/11/2024 09:14:45 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 120895 has been updated at 0800 hrs 25/11/2024 to the following:

1. From 1500 hrs to 1530 hrs 27/11/2024.
The forecast capacity reserve requirement is 849 MW.
The minimum capacity reserve available is 431 MW.

2. From 1700 hrs to 2130 hrs 27/11/2024.
The forecast capacity reserve requirement is 817 MW.
The minimum capacity reserve available is 275 MW.

3. From 2200 hrs to 2230 hrs 27/11/2024.
The forecast capacity reserve requirement is 752 MW.
The minimum capacity reserve available is 702 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120897RECALL GEN CAPACITY25/11/2024 08:40:06 AM

Request for Generator Recall Information for the period 27/11/2024 for Region QLD

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice no. 120895.

Please provide Generator Recall Information for the period from 27/11/2024, by 1500 hrs on 25/11/2024 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf


AEMO Operations
     
120896RECALL GEN CAPACITY25/11/2024 08:38:28 AM

Request for Generator Recall Information for the period 27/11/2024 for Region NSW

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice no. 120894, and 120892.

Please provide Generator Recall Information for the period from 27/11/2024, by 1500 hrs on 25/11/2024 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf