Market Notices

120900RESERVE NOTICE25/11/2024 10:29:29 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120893 has been updated at 0800 hrs 25/11/2024 to the following:

From 0700 hrs to 0730 hrs 28/11/2024.
The forecast capacity reserve requirement is 1525 MW.
The minimum capacity reserve available is 1319 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120899RESERVE NOTICE25/11/2024 09:13:46 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120892 has been updated at 0800 hrs 25/11/2024 to the following:

1. From 1230 hrs to 1500 hrs 27/11/2024.
The forecast capacity reserve requirement is 1461 MW.
The minimum capacity reserve available is 0 MW.

2. From 2000 hrs to 2359 hrs 27/11/2024.
The forecast capacity reserve requirement is 1335 MW.
The minimum capacity reserve available is 0 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120898RESERVE NOTICE25/11/2024 09:14:45 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 120895 has been updated at 0800 hrs 25/11/2024 to the following:

1. From 1500 hrs to 1530 hrs 27/11/2024.
The forecast capacity reserve requirement is 849 MW.
The minimum capacity reserve available is 431 MW.

2. From 1700 hrs to 2130 hrs 27/11/2024.
The forecast capacity reserve requirement is 817 MW.
The minimum capacity reserve available is 275 MW.

3. From 2200 hrs to 2230 hrs 27/11/2024.
The forecast capacity reserve requirement is 752 MW.
The minimum capacity reserve available is 702 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


AEMO Operations
     
120897RECALL GEN CAPACITY25/11/2024 08:40:06 AM

Request for Generator Recall Information for the period 27/11/2024 for Region QLD

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice no. 120895.

Please provide Generator Recall Information for the period from 27/11/2024, by 1500 hrs on 25/11/2024 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf


AEMO Operations
     
120896RECALL GEN CAPACITY25/11/2024 08:38:28 AM

Request for Generator Recall Information for the period 27/11/2024 for Region NSW

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice no. 120894, and 120892.

Please provide Generator Recall Information for the period from 27/11/2024, by 1500 hrs on 25/11/2024 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf


AEMO Operations
     
120895RESERVE NOTICE25/11/2024 04:53:53 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 120886 has been updated at 0445 hrs 25/11/2024 to the following:

[1.] From 1500 hrs 27/11/2024 to 1530 hrs 27/11/2024.
The forecast capacity reserve requirement is 895 MW.
The minimum capacity reserve available is 331 MW.

[2.] From 1700 hrs 27/11/2024 to 2200 hrs 27/11/2024.
The forecast capacity reserve requirement is 880 MW.
The minimum capacity reserve available is 294 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
120893RESERVE NOTICE25/11/2024 04:36:14 AM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 28/11/2024

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:

[1.] From 1330 hrs 28/11/2024 to 1530 hrs 28/11/2024.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 414 MW.

[2.] From 1600 hrs 28/11/2024 to 1700 hrs 28/11/2024.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 593 MW.

[3.] From 1730 hrs 28/11/2024 to 1800 hrs 28/11/2024.
The forecast capacity reserve requirement is 730 MW.
The minimum capacity reserve available is 696 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
120892RESERVE NOTICE25/11/2024 04:31:58 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 27/11/2024

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 120880 has been updated at 0415 hrs 25/11/2024 to the following:

[2.] From 0730 hrs 27/11/2024 to 1130 hrs 27/11/2024.
The forecast capacity reserve requirement is 1373 MW.
The minimum capacity reserve available is 89 MW.

[3.] From 1930 hrs 27/11/2024 to 0000 hrs 28/11/2024.
The forecast capacity reserve requirement is 1411 MW.
The minimum capacity reserve available is 0 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

Manager NEM Real Time Operations
     
120891NON-CONFORMANCE24/11/2024 07:45:13 PM

NON-CONFORMANCE Region QLD1 Sunday, 24 November 2024

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Sunday, 24 November 2024

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: MPP_1
Duration: 24/11/2024 19:00 to 24/11/2024 19:45
Amount: 13 MW
Constraint: NC-Q_MPP_1

Auto-generated on behalf of Manager NEM Real Time Operations
     