Market Notices

126582MARKET INTERVENTION17/04/2025 02:45:57 PM

Cancellation - Possible intervention to manage power system security in South Australia (SA) region 18/04/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Possible intervention to manage power system security in South Australia (SA) region 18/04/2025

Refer Market Notice 126581

AEMO no longer foresees a possible requirement for intervention to manage power system security in SA region. The advice of possible intervention is cancelled from 1445 hrs 17/04/2025.

Manager NEM Real Time Operations
     
126581MARKET INTERVENTION17/04/2025 12:35:45 PM

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO ELECTRICITY MARKET NOTICE

Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region

AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0830 hrs 18/04/2025.

The foreseeable circumstance requiring the need for intervention is Voltage.

Manager NEM Real Time Operations
     
126580POWER SYSTEM EVENTS17/04/2025 12:38:34 PM

Update - Non-credible contingency event - QLD region - 16/04/2025

AEMO ELECTRICITY MARKET NOTICE.

Update - Non-credible contingency event - QLD region - 16/04/2025

Refer AEMO Electricity Market Notice 126579

At 1231 hrs the Greenbank - Molendinar 8825 275kV line was returned to service.

The cause of this non-credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.

AEMO will not reclassify this event as a credible contingency event.

Manager NEM Real Time Operations
     
126579POWER SYSTEM EVENTS16/04/2025 11:10:49 PM

Non-credible contingency event - QLD region - 16/04/2025

AEMO ELECTRICITY MARKET NOTICE.

Refer market notice: 126577

Non-credible contingency event - QLD region - 16/04/2025

At 2110 hrs the Greenbank - Molendinar 8825 275kV line tripped at the Molendinar end only.

AEMO did not instruct load shedding.

AEMO has not been advised of any disconnection of bulk electrical load.

The cause of this non credible contingency event is not known at this stage.


Manager NEM Real Time Operations
     
126564MARKET INTERVENTION15/04/2025 01:31:54 PM

Cancellation - AEMO Intervention Event - SA region 15/04/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - AEMO Intervention Event - SA region 15/04/2025

Refer to Market Notice 126540

The AEMO Intervention Event and all associated directions are cancelled from 1330 hrs on 15/04/2025.


Manager NEM Real Time Operations
     
126563MARKET INTERVENTION15/04/2025 01:31:44 PM

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE

Cancellation: Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 126562

Direction is cancelled from: 1330 hrs 15/04/2025

Manager NEM Real Time Operations
     
126562MARKET INTERVENTION15/04/2025 12:28:27 AM

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 126541

PPCCGT PELICAN POINT at 0730 hrs 15/04/2025 to Remain synchronised and follow dispatch targets.

The PPCCGT PELICAN POINT direction is expected to stay in place until 1330 hrs 15/04/2025.

The direction update is issued at 0030 hrs 15/04/2025.

Manager NEM Real Time Operations
     
126560RESERVE NOTICE14/04/2025 06:13:59 PM

Cancellation of Actual (LOR1) condition in the NSW region - 14/04/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the NSW region - 14/04/2025

The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.126559 is cancelled at 1811 hrs 14/04/2025.

Manager NEM Real Time Operations
     
126559RESERVE NOTICE14/04/2025 05:48:58 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 14/04/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 14/04/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1800 hrs

The capacity reserve requirement is 1588 MW
The minimum capacity reserve available is 1553 MW

Manager NEM Real Time Operations
     
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm