Filter by category
Filter by Date
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0000 hrs 19/01/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 123385
The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 1700 hrs 18/01/2025.
The direction update is issued at 1500 hrs 17/01/2025.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 123384
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 1430 hrs 18/01/2025.
The direction update is issued at 1500 hrs 17/01/2025.
Manager NEM Real Time Operations
NEM Local Temperature Alerts for SA, VIC from 17 Jan 2025 to 21 Jan 2025
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Port Augusta Ap (39+ Deg C): 19th Jan
VIC
Mildura Ap (39+ Deg C): 20th Jan, 21st Jan
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
NON-CONFORMANCE Region QLD1 Friday, 17 January 2025
NON-CONFORMANCE QLD1 Region Friday, 17 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: KINGASF1
Duration: 17/01/2025 06:35 to 17/01/2025 06:55
Amount: 10 MW
Constraint: NC-Q_KINGASF1
Auto-generated on behalf of Manager NEM Real Time Operations
Network Augmentation Commissioned - Vic Region - 16/01/2025
Network Augmentation Commissioned - Vic Region - 16/01/2025
At 2128 hrs 16/01/2025, the Koorangie 220 kV Terminal Station has been cut in to the existing Kerang - Wemen 220 kV transmission line resulting in the following network augmentations being commissioned:
Koorangie 220 kV Terminal Station
Koorangie - Wemen 220 kV transmission line
Kerang - Koorangie 220 kV transmission line
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 123293
The TORRB3 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 18/01/2025.
The direction update is issued at 1700 hrs 16/01/2025.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 123292
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 18/01/2025.
The direction update is issued at 1700 hrs 16/01/2025.
Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Thursday, 16 January 2025
NON-CONFORMANCE NSW1 Region Thursday, 16 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: WTAHB1
Duration: 16/01/2025 11:35 to 16/01/2025 11:40
Amount: -9 MW
Constraint: NC-N_WTAHB1
Auto-generated on behalf of Manager NEM Real Time Operations