Planned outage of South Morang - Sydenham No 1 500 kV line in the VIC region beginning on 21/02/2025.
The South Morang - Sydenham No 1 500 kV in the Victoria (VIC) region is planned to be out of service from 0600 hrs on 21/02/2025 to 1700 hrs on 24/02/2025.
A credible contingency event during this planned outage could cause:
* A large reduction in generation in VIC; and/ or
* Restrict power transfer across the VIC - South Australia (SA) interconnector (Heywood interconnector).
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
Planned outage of Moorabool - Sydenham No 1 500 kV line in the VIC region beginning on 23/02/2025.
The Moorabool - Sydenham No 1 500 kV line in the Victoria (VIC) region is planned to be out of service from 0600 hrs to 1600 hrs on 23/02/2025.
A credible contingency event during this planned outage may require market intervention, such as the issuing of directions.
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
NEM Local Temperature Alerts for SA, VIC from 18 Feb 2025 to 22 Feb 2025
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Mt Gambier Ap (39+ Deg C): 22nd Feb
Port Augusta Ap (39+ Deg C): 22nd Feb
VIC
Mildura Ap (39+ Deg C): 22nd Feb
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
QNI Minor testing (NSW to Qld) 16th February 2025 for flows from NSW to Qld up to 850 MW
Refer to market notice 123692
There is an opportunity for testing QNI Minor for flows from NSW to Qld up to 850 MW on Saturday 16th February 2025 from 1200 hrs to 1800 hrs.
This test includes switching of transmission lines in New South Wales and/or Queensland regions.
Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade
AEMO Operations
NON-CONFORMANCE Region QLD1 Saturday, 15 February 2025
NON-CONFORMANCE QLD1 Region Saturday, 15 February 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 15/02/2025 15:50 to 15/02/2025 15:55
Amount: 15 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Saturday, 15 February 2025
NON-CONFORMANCE QLD1 Region Saturday, 15 February 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MIDDLSF1
Duration: 15/02/2025 10:50 to 15/02/2025 11:45
Amount: 20 MW
Constraint: NC-Q_MIDDLSF1
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Friday, 14 February 2025
NON-CONFORMANCE QLD1 Region Friday, 14 February 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: GSTONE5
Duration: 14/02/2025 22:55 to 14/02/2025 23:00
Amount: 28 MW
Constraint: NC-Q_GSTONE5