123180RESERVE NOTICE13/01/2025 06:20:05 PM

Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Update - Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 13/01/2025

Refer market notice: 123171

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1800 hrs.

The Actual LOR1 condition is forecast to exist until 2000 hrs.

The forecast capacity reserve requirement is 1365 MW.
The minimum capacity reserve available is 966 MW.

Manager NEM Real Time Operations
     
123178RESERVE NOTICE13/01/2025 06:15:43 PM

Cancellation of Actual (LOR2) condition in the NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the NSW region - 13/01/2025

The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.123176 is cancelled at 1815 hrs 13/01/2025.

Manager NEM Real Time Operations
     
123176RESERVE NOTICE13/01/2025 05:49:35 PM

Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 13/01/2025

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs

The capacity reserve required is 714 MW
The minimum reserve available is 560 MW

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement a AEMO intervention event.

Manager NEM Real Time Operations
     
123171RESERVE NOTICE13/01/2025 04:58:29 PM

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 13/01/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1630 hrs.
The Actual LOR1 condition is forecast to exist until 1700 hrs

The capacity reserve requirement is 1390 MW
The minimum capacity reserve available is 861 MW

Manager NEM Real Time Operations
     
123164INTER-REGIONAL TRANSFER13/01/2025 03:13:49 PM

Inter-regional transfer limit variation - Kemps Creek No.3 Transformer - NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Kemps Creek No.3 Transformer - NSW region - 13/01/2025

A planned outage of Kemps Creek No.3 Transformer in the NSW region was scheduled from 1330 hrs 23/12/2024 to 1330 hrs 15/01/2025.

The outage has been completed and Kemps Creek No.3 Transformer returned to service at 1419 hrs 13/01/2025

Constraint set(s) revoked: N-KC_TX

Manager NEM Real Time Operations
     
123079INTER-REGIONAL TRANSFER12/01/2025 10:18:12 AM

Inter-regional transfer limit variation - Armidale-Sapphire 8E 330 kV line - NSW region - 12/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Armidale-Sapphire 8E 330 kV line - NSW region - 12/01/2025

A planned outage of Armidale-Sapphire 8E 330 kV line in the NSW region was scheduled from 0500 hrs 12/01/2025 to 1700 hrs 12/01/2025.

The outage has been completed and Armidale-Sapphire 8E 330kV line returned to service at 1015 hrs 12/01/2025

Constraint set(s) revoked:
N-ARSR_8E
N-DM_SVC
N-TW_SVC
N-X_8E+DM+TW+LS_SVC

Manager NEM Real Time Operations
     
123036INTER-REGIONAL TRANSFER11/01/2025 01:11:48 PM

Inter-regional transfer limit variation - [outage element] - TAS region - 11/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - [outage element] - TAS region - 11/01/2025

At 1233 hrs 11/01/2025 there was an unplanned outage of Gordon - Chapel St No 1 220 kV line. There was approximately 52 MW of load reduction at Nyrstar.

The following constraint set(s) were invoked at 1240 hrs
F-T-CSGO
T-CSGO

This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
122993GENERAL NOTICE10/01/2025 10:34:07 AM

NEM Local Temperature Alerts for SA, VIC from 10 Jan 2025 to 14 Jan 2025

AEMO ELECTRICITY MARKET NOTICE

AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.

SA
Port Augusta Ap (39+ Deg C): 11th Jan, 14th Jan

VIC
Mildura Ap (39+ Deg C): 12th Jan, 13th Jan, 14th Jan

The NEM Local Temperature Alert Levels are:

Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.

AEMO requests Market Participants to:

1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,

2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.

Further information is available at:

https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts

AEMO Operations Planning
     
122985INTER-REGIONAL TRANSFER09/01/2025 12:50:38 PM

Inter-regional transfer limit variation - Armidale-Uralla 8U 330kV Line - NSW region - 09/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Armidale-Uralla 8U 330kV Line - NSW region - 09/01/2025

A planned outage of Armidale-Uralla 8U 330kV Line in the NSW region was scheduled from 0500 hrs 09/01/2025 to 1700 hrs 09/01/2025.

The outage has been completed and Armidale-Uralla 8U 330kV Line returned to service at 1250 hrs 09/01/2025

Constraint set revoked: N-ARUL_8U

Manager NEM Real Time Operations
     