123645RESERVE NOTICE24/01/2025 04:46:13 AM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the Qld Region on 24/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the Qld region advised in AEMO Electricity Market Notice No. 123637 is cancelled at 0445 hrs 24/01/2025

Manager NEM Real Time Operations
     
123637RESERVE NOTICE23/01/2025 05:23:26 PM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:


[1.] From 1900 hrs 24/01/2025 to 1930 hrs 24/01/2025.
The forecast capacity reserve requirement is 854 MW.
The minimum capacity reserve available is 830 MW.


Manager NEM Real Time Operations
     
123631INTER-REGIONAL TRANSFER23/01/2025 04:59:59 PM

Inter-regional transfer limit variation - Lismore No.1 132 kV SVC - NSW region - 23/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Lismore No.1 132 kV SVC - NSW region - 23/01/2025

A planned outage of Lismore No.1 132 kV SVC in the NSW region was scheduled from 2200 hrs 22/01/2025 to 1600 hrs 24/01/2025.

The outage has been completed and Lismore No.1 132 kV SVC returned to service at 1631 hrs 23/01/2025

Constraint set(s) revoked: N-LS_VC1

Manager NEM Real Time Operations
     
123626RESERVE NOTICE23/01/2025 03:05:29 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 123523 is cancelled at 1400 hrs 23/01/2025.

No LOR condition is currently forecast in the STPASA period.

AEMO Operations
     
123606SETTLEMENTS RESIDUE22/01/2025 10:00:26 PM

[EventId:202501222200_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 22 January 2025 22:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 2200 hrs on 22 January 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 22 January 2025.

Refer to market notice: 123585

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 2200 hrs on 22 January 2025.

This is an AEMO autogenerated Market Notice.
     
123602RESERVE NOTICE22/01/2025 08:14:17 PM

Cancellation of Actual (LOR1) condition in the QLD region - 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 22/01/2025

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.123589 is cancelled at 2015 hrs 22/01/2025.

Manager NEM Real Time Operations
     
123601INTER-REGIONAL TRANSFER22/01/2025 08:11:14 PM

Cancellation -Inter-regional transfer limit variation - Constraint invocation to manage Power System Security in NSW region - 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation -Inter-regional transfer limit variation - Constraint invocation to manage Power System Security in NSW region - 22/01/2025

Refer to MN 123588

In order to maintain the power system in a secure operating state in the NSW region (Northern NSW) ,

AEMO has invoked constraint set #N-Q-MNSP1_E from 1720 hrs until 1845 hs 22/01/2025.

This constraint set contains equations with the following interconnector on the LHS;
N-Q-MNSP1

Manager NEM Real Time Operations
     
123597INTER-REGIONAL TRANSFER22/01/2025 07:53:16 PM

Inter-regional transfer limit variation -Lismore No1 SVC - NSW region - 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Lismore No1 SVC - NSW region - 22/01/2025

A planned outage of Lismore No1 SVC in the NSW region was scheduled from 0620 hrs 08/01/2025 to 1600 hrs 24/01/2025.

The outage has been completed and Lismore No1 SVC returned to service at 1900 hrs 22/01/2025

Constraint set(s) revoked: N-LS_VC1

Manager NEM Real Time Operations
     
123596SETTLEMENTS RESIDUE22/01/2025 07:30:28 PM

[EventId:202501221930_NRM_NSW1_QLD1_stopped] NEGRES CONSTRAINT NRM_NSW1_QLD1 ceased operating from 22 January 2025 19:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1930 hrs on 22 January 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to QLD - 22 January 2025.

Refer to market notice: 123591

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to QLD directional interconnector.

The negative residue constraint NRM_NSW1_QLD1 ceased operating at 1930 hrs on 22 January 2025.

This is an AEMO autogenerated Market Notice.
     