PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:
[1.] From 1500 hrs 26/11/2024 to 1530 hrs 26/11/2024.
The forecast capacity reserve requirement is 1370 MW.
The minimum capacity reserve available is 1170 MW.
[2.] From 1930 hrs 26/11/2024 to 2030 hrs 26/11/2024.
The forecast capacity reserve requirement is 1694 MW.
The minimum capacity reserve available is 1213 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 1800 hrs 24/11/2024 to 1900 hrs 24/11/2024.
The forecast capacity reserve requirement is 1538 MW.
The minimum capacity reserve available is 1293 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 27/11/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 120863 has been updated at 1630 hrs 24/11/2024 to the following:
[1.] From 1500 hrs 27/11/2024 to 1530 hrs 27/11/2024.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 473 MW.
[2.] From 1700 hrs 27/11/2024 to 1730 hrs 27/11/2024.
The forecast capacity reserve requirement is 1254 MW.
The minimum capacity reserve available is 804 MW.
[3.] From 2130 hrs 27/11/2024 to 2300 hrs 27/11/2024.
The forecast capacity reserve requirement is 1278 MW.
The minimum capacity reserve available is 1104 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120858 is cancelled at 1515 hrs 24/11/2024.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:
[1.] From 1400 hrs 28/11/2024 to 1430 hrs 28/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1310 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 27/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120861 has been updated at 1445 hrs 24/11/2024 to the following:
[1.] From 0830 hrs 27/11/2024 to 0930 hrs 27/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1298 MW.
[2.] From 2300 hrs 27/11/2024 to 0030 hrs 28/11/2024.
The forecast capacity reserve requirement is 1744 MW.
The minimum capacity reserve available is 1218 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120860 has been updated at 1445 hrs 24/11/2024 to the following:
[1.] From 1330 hrs 26/11/2024 to 1400 hrs 26/11/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1233 MW.
[2.] From 2330 hrs 26/11/2024 to 0030 hrs 27/11/2024.
The forecast capacity reserve requirement is 1728 MW.
The minimum capacity reserve available is 1260 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 25/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:
[1.] From 1630 hrs 25/11/2024 to 1900 hrs 25/11/2024.
The forecast capacity reserve requirement is 1712 MW.
The minimum capacity reserve available is 1307 MW.
Manager NEM Real Time Operations
[EventId:202411231900_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 23 November 2024 19:00
Issued by Australian Energy Market Operator Ltd at 1900 hrs on 23 November 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 23 November 2024.
Refer to market notice: 120871
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1900 hrs on 23 November 2024.