[EventId:202504141740_review] Prices for interval 14-Apr-2025 17:40 are subject to review
Issued by Australian Energy Market Operator Ltd at 1735 hrs on 14 April 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 14-Apr-2025 17:40.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202504141735_review] Prices for interval 14-Apr-2025 17:35 are subject to review
Issued by Australian Energy Market Operator Ltd at 1730 hrs on 14 April 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 14-Apr-2025 17:35.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202504141730_review] Prices for interval 14-Apr-2025 17:30 are subject to review
Issued by Australian Energy Market Operator Ltd at 1725 hrs on 14 April 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 14-Apr-2025 17:30.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202504141725_review] Prices for interval 14-Apr-2025 17:25 are subject to review
Issued by Australian Energy Market Operator Ltd at 1720 hrs on 14 April 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 14-Apr-2025 17:25.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202504141720_review] Prices for interval 14-Apr-2025 17:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1715 hrs on 14 April 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 14-Apr-2025 17:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 14/04/2025 to 1800 hrs 14/04/2025.
The forecast capacity reserve requirement is 1537 MW.
The minimum capacity reserve available is 1365 MW.
Manager NEM Real Time Operations
[EventId:202504141715_review] Prices for interval 14-Apr-2025 17:15 are subject to review
Issued by Australian Energy Market Operator Ltd at 1710 hrs on 14 April 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 14-Apr-2025 17:15.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/04/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 126538 is cancelled at 1600 hrs 14/04/2025.
Manager NEM Real Time Operations
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 126540.
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1600 hrs 14/04/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0100 hrs 15/04/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 1330 hrs 15/04/2025.
Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations