Filter by category
Filter by Date
[EventId:202502101300_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 10 February 2025 13:00
Issued by Australian Energy Market Operator Ltd at 1300 hrs on 10 February 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 February 2025.
Refer to market notice: 124421
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1300 hrs on 10 February 2025.
This is an AEMO autogenerated Market Notice.
[EventId:202502101235_confirmed] Prices for interval 10-Feb-2025 12:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1255 hrs on 10 February 2025
PRICES ARE NOW CONFIRMED for trading interval 10-Feb-2025 12:35.
In accordance with Market Notice 124423 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502101255_confirmed] Prices for interval 10-Feb-2025 12:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1255 hrs on 10 February 2025
PRICES ARE NOW CONFIRMED for trading interval 10-Feb-2025 12:55.
In accordance with Market Notice 124428 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502101250_confirmed] Prices for interval 10-Feb-2025 12:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1255 hrs on 10 February 2025
PRICES ARE NOW CONFIRMED for trading interval 10-Feb-2025 12:50.
In accordance with Market Notice 124427 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502101245_confirmed] Prices for interval 10-Feb-2025 12:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1255 hrs on 10 February 2025
PRICES ARE NOW CONFIRMED for trading interval 10-Feb-2025 12:45.
In accordance with Market Notice 124425 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502101240_confirmed] Prices for interval 10-Feb-2025 12:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1255 hrs on 10 February 2025
PRICES ARE NOW CONFIRMED for trading interval 10-Feb-2025 12:40.
In accordance with Market Notice 124424 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502101230_confirmed] Prices for interval 10-Feb-2025 12:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1255 hrs on 10 February 2025
PRICES ARE NOW CONFIRMED for trading interval 10-Feb-2025 12:30.
In accordance with Market Notice 124422 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Reclassification of a Non-Credible Contingency Event: Bannaby - Mt Piper 5A6 500kV line and Bannaby - Mt Piper 5A7 500kV line in NSW1 due to Lightning.
Reclassification of a Non-Credible Contingency Event as a Credible Contingency Event due to Lightning. AEMO considers the simultaneous trip of the following circuits to now be more likely and reasonably possible. Accordingly AEMO has reclassified it as a credible contingency event.
Region: NSW1
Lines: Bannaby - Mt Piper 5A6 500kV and Bannaby - Mt Piper 5A7 500kV
Duration: 10/02/2025 12:41 until further notice
Constraint set(s) invoked:
N-5A6+5A7_N-2 Constraint set contains the following interconnector(s) on the left hand side:
N-Q-MNSP1
NSW1-QLD1
VIC1-NSW1
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202502101220_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 10 February 2025 12:20
Issued by Australian Energy Market Operator Ltd at 1220 hrs on 10 February 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 10 February 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1220 hrs on 10 February 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.