Filter by category
Filter by Date
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 01/03/2025
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 01/03/2025
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs
The capacity reserve requirement is 1400 MW
The minimum capacity reserve available is 1354 MW
Manager NEM Real Time Operations
[EventId:202503011630_confirmed] Prices for interval 01-Mar-2025 16:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 1 March 2025
PRICES ARE NOW CONFIRMED for trading interval 01-Mar-2025 16:30.
In accordance with Market Notice 125148 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503011625_confirmed] Prices for interval 01-Mar-2025 16:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 1 March 2025
PRICES ARE NOW CONFIRMED for trading interval 01-Mar-2025 16:25.
In accordance with Market Notice 125147 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503011620_confirmed] Prices for interval 01-Mar-2025 16:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 1 March 2025
PRICES ARE NOW CONFIRMED for trading interval 01-Mar-2025 16:20.
In accordance with Market Notice 125146 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503011615_confirmed] Prices for interval 01-Mar-2025 16:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 1 March 2025
PRICES ARE NOW CONFIRMED for trading interval 01-Mar-2025 16:15.
In accordance with Market Notice 125145 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503011610_confirmed] Prices for interval 01-Mar-2025 16:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 1 March 2025
PRICES ARE NOW CONFIRMED for trading interval 01-Mar-2025 16:10.
In accordance with Market Notice 125144 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202503011605_confirmed] Prices for interval 01-Mar-2025 16:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1630 hrs on 1 March 2025
PRICES ARE NOW CONFIRMED for trading interval 01-Mar-2025 16:05.
In accordance with Market Notice 125143 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 125140
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1600 hrs 01/03/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 2330 hrs 01/03/2025
Services provided: Voltage Control
Circumstances necessitating the Direction:Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 03/03/2025.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Direction - SA region to Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 125140
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to Pelican Point Power Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: Pelican Point Power Limited - PPCCGT PELICAN POINT at 1600 hrs 01/03/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0700 hrs 02/03/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 03/03/2025.
Pelican Point Power Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations