124729NON-CONFORMANCE15/02/2025 03:55:18 PM

NON-CONFORMANCE Region QLD1 Saturday, 15 February 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Saturday, 15 February 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: MPP_2
Duration: 15/02/2025 15:50 to 15/02/2025 15:55
Amount: 15 MW
Constraint: NC-Q_MPP_2

Auto-generated on behalf of Manager NEM Real Time Operations
     
124710NON-CONFORMANCE15/02/2025 11:45:24 AM

NON-CONFORMANCE Region QLD1 Saturday, 15 February 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Saturday, 15 February 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: MIDDLSF1
Duration: 15/02/2025 10:50 to 15/02/2025 11:45
Amount: 20 MW
Constraint: NC-Q_MIDDLSF1

Auto-generated on behalf of Manager NEM Real Time Operations
     
124696NON-CONFORMANCE14/02/2025 11:00:15 PM

NON-CONFORMANCE Region QLD1 Friday, 14 February 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Friday, 14 February 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: GSTONE5
Duration: 14/02/2025 22:55 to 14/02/2025 23:00
Amount: 28 MW
Constraint: NC-Q_GSTONE5

Auto-generated on behalf of Manager NEM Real Time Operations
     
124622INTER-REGIONAL TRANSFER13/02/2025 05:52:57 PM

Inter-regional transfer limit variation - Greenbank 275kV SVC - QLD region - 13/02/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Greenbank 275kV SVC - QLD region - 13/02/2025

At 1738 hrs 13/02/2025 there was an unplanned outage of the Greenbank 275kV SVC.

The following constraint set(s) invoked at 1745 hrs 13/02/2025
Q-GB_VC

This constraint set(s) contains equations with the following interconnectors on the LHS.
NSW1-QLD1,N-Q-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
124617INTER-REGIONAL TRANSFER13/02/2025 02:53:56 PM

Inter-regional transfer limit variation - Directlink- NSW region - 13/02/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - No.2 Leg of Directlink - NSW region - 13/02/2025

A planned outage of the No.2 Leg of Directlink in the NSW region was scheduled from 1517 hrs 30/01/2025 to 1700 hrs 20/02/2025.

The outage has been completed and the No.2 Leg of Directlink returned to service at 1312 hrs 13/02/2025

Constraint set(s) revoked: N-X_MBTE_2

Manager NEM Real Time Operations
     
124616MINIMUM SYSTEM LOAD13/02/2025 03:08:09 PM

Cancellation of Forecast Minimum System Load (MSL) MSL1 event in the Vic Region on 16/02/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation - Forecast MSL1 - VIC Region at 1400 hrs 13/02/2025.

Refer to Market Notice 124560 for MSL1.


AEMO Operations
     
124586RESERVE NOTICE13/02/2025 10:47:48 AM

PDPASA - Update of the suspect Lack Of Reserve Level 2 (LOR2) condition in the QLD Region on 13/02/2025

AEMO ELECTRICITY MARKET NOTICE

The suspect LOR2 condition advised in AEMO Electricity Market Notice No. 124585 has been reviewed.

AEMO considers this forecast LOR2 condition invalid

No LOR2 condition is currently forecast for the QLD region.

Manager NEM Real Time Operation
     
124585RESERVE NOTICE13/02/2025 06:45:48 AM

PDPASA - Suspect Lack Of Reserve Level 2 (LOR2) in the QLD Region on 13/02/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO considers that there is a suspect Forecast LOR2 condition for the QLD region for the following period[s]:

[1.] From 1830 hrs 13/02/2025 to 1930 hrs 13/02/2025.
The forecast capacity reserve requirement is 639 MW.
The minimum capacity reserve available is 480 MW.

AEMO is currently investigating this LOR2 forecast condition to confirm whether they are valid.

Manager NEM Real Time Operations
     
124560MINIMUM SYSTEM LOAD12/02/2025 03:04:06 PM

Forecast Minimum System Load (MSL1) condition in the VIC region on 16/02/2025

AEMO ELECTRICITY MARKET NOTICE

Update to Market Notice 124467 - AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the VIC region on 16/02/2025.

Minimum System Load (MSL) conditions are forecast when regional demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
o MSL1 - 2115 MW
o MSL2 - 1615 MW
o MSL3 - 1115 MW

The regional demand is forecast to be below the MSL1 threshold for the following period:
From 1230 hrs to 1430 hrs 16/02/2025. Minimum regional demand is forecast to be 2012 MW at 1330 hrs.

Forecast regional demand (DEMAND50) is published in Short Term and Pre-Dispatch PASA region solution reports available on Market Data NEMWEB: https://aemo.com.au/en/energy-systems/electricity/national-electricity-market-nem/data-nem/market-data-nemweb .


AEMO Operations
     