[EventId:202503152000_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 March 2025 20:00
Issued by Australian Energy Market Operator Ltd at 2000 hrs on 15 March 2025
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 March 2025.
Refer to market notice: 125680
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 2000 hrs on 15 March 2025.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR1) condition in the NSW region - 15/03/2025
Cancellation of Actual (LOR1) condition in the NSW region - 15/03/2025
The Actual LOR1 Condition in the NSW Region advised in AEMO Electricity Market Notice No.125691 is cancelled at 1835 hrs 15/03/2025.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 15/03/2025
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 15/03/2025
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs
The capacity reserve requirement is 1642 MW
The minimum capacity reserve available is 1550 MW
Manager NEM Real Time Operations
NON-CONFORMANCE Region SA1 Saturday, 15 March 2025
NON-CONFORMANCE SA1 Region Saturday, 15 March 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: LADBROK2
Duration: 15/03/2025 17:00 to 15/03/2025 17:05
Amount: -9 MW
Constraint: NC-S_LADBROK2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region SA1 Saturday, 15 March 2025
NON-CONFORMANCE SA1 Region Saturday, 15 March 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: LADBROK1
Duration: 15/03/2025 17:00 to 15/03/2025 17:05
Amount: -7 MW
Constraint: NC-S_LADBROK1
Auto-generated on behalf of Manager NEM Real Time Operations
[EventId:202503151635_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 March 2025 16:35
Issued by Australian Energy Market Operator Ltd at 1635 hrs on 15 March 2025
ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 March 2025.
Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.
The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1635 hrs on 15 March 2025.
This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1
The RHS of the constraint equation may be adjusted to manage residues.
This is an AEMO autogenerated Market Notice.
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/03/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
[1.] From 1730 hrs 15/03/2025 to 1830 hrs 15/03/2025.
The forecast capacity reserve requirement is 1663 MW.
The minimum capacity reserve available is 1546 MW.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 125665 has been updated to the following:
[1.] From 1630 hrs 16/03/2025 to 1900 hrs 16/03/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1062 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 16/03/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1630 hrs 16/03/2025 to 1900 hrs 16/03/2025.
The forecast capacity reserve requirement is 1859 MW.
The minimum capacity reserve available is 1106 MW.
Manager NEM Real Time Operations