123176RESERVE NOTICE13/01/2025 05:49:35 PM

Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 13/01/2025

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1730 hrs.
The Actual LOR2 condition is forecast to exist until 1800 hrs

The capacity reserve required is 714 MW
The minimum reserve available is 560 MW

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement a AEMO intervention event.

Manager NEM Real Time Operations
     
123164INTER-REGIONAL TRANSFER13/01/2025 03:13:49 PM

Inter-regional transfer limit variation - Kemps Creek No.3 Transformer - NSW region - 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Kemps Creek No.3 Transformer - NSW region - 13/01/2025

A planned outage of Kemps Creek No.3 Transformer in the NSW region was scheduled from 1330 hrs 23/12/2024 to 1330 hrs 15/01/2025.

The outage has been completed and Kemps Creek No.3 Transformer returned to service at 1419 hrs 13/01/2025

Constraint set(s) revoked: N-KC_TX

Manager NEM Real Time Operations
     
123079INTER-REGIONAL TRANSFER12/01/2025 10:18:12 AM

Inter-regional transfer limit variation - Armidale-Sapphire 8E 330 kV line - NSW region - 12/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Armidale-Sapphire 8E 330 kV line - NSW region - 12/01/2025

A planned outage of Armidale-Sapphire 8E 330 kV line in the NSW region was scheduled from 0500 hrs 12/01/2025 to 1700 hrs 12/01/2025.

The outage has been completed and Armidale-Sapphire 8E 330kV line returned to service at 1015 hrs 12/01/2025

Constraint set(s) revoked:
N-ARSR_8E
N-DM_SVC
N-TW_SVC
N-X_8E+DM+TW+LS_SVC

Manager NEM Real Time Operations
     
123036INTER-REGIONAL TRANSFER11/01/2025 01:11:48 PM

Inter-regional transfer limit variation - [outage element] - TAS region - 11/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - [outage element] - TAS region - 11/01/2025

At 1233 hrs 11/01/2025 there was an unplanned outage of Gordon - Chapel St No 1 220 kV line. There was approximately 52 MW of load reduction at Nyrstar.

The following constraint set(s) were invoked at 1240 hrs
F-T-CSGO
T-CSGO

This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
122985INTER-REGIONAL TRANSFER09/01/2025 12:50:38 PM

Inter-regional transfer limit variation - Armidale-Uralla 8U 330kV Line - NSW region - 09/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Armidale-Uralla 8U 330kV Line - NSW region - 09/01/2025

A planned outage of Armidale-Uralla 8U 330kV Line in the NSW region was scheduled from 0500 hrs 09/01/2025 to 1700 hrs 09/01/2025.

The outage has been completed and Armidale-Uralla 8U 330kV Line returned to service at 1250 hrs 09/01/2025

Constraint set revoked: N-ARUL_8U

Manager NEM Real Time Operations
     
122962INTER-REGIONAL TRANSFER08/01/2025 12:20:09 PM

Inter-regional transfer limit variation - Hummocks - Bungama - Snowtown 132kV Line - SA region - 08/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Hummocks - Bungama - Snowtown 132kV Line - SA region - 08/01/2025

At 1210 hrs 08/01/2025 there was a short notice outage of Hummocks - Bungama - Snowtown 132kV Line.

The following constraint set(s) invoked at 1210 hrs 08/01/2025
S-HUBG

This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
122961INTER-REGIONAL TRANSFER08/01/2025 12:09:21 PM

Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 08/01/2025

AEMO ELECTRICITY MARKET NOTICE

In order to maintain the power system in a secure operating state in the NSW region, AEMO has invoked automated constraint set CA_BRIS_56906542 from 1155 hrs until further notice.

This constraint set contains equations with the following interconnector on the LHS;

V-S-MNSP1
VIC1-NSW1

Manager NEM Real Time Operations
     
122920INTER-REGIONAL TRANSFER07/01/2025 03:36:39 AM

Inter-regional transfer limit variation - constraint automation to manage Power System Security in VIC region - 07/01/2025

AEMO ELECTRICITY MARKET NOTICE

In order to maintain the power system in a secure operating state in the VIC region, AEMO has invoked automated constraint set CA_BRIS_5687999A from 0330 hrs until further notice.

This constraint set contains equations with the following interconnector on the LHS;

V-S-MNSP1

Refer to AEMO Network Outage Scheduler (NOS) for further information.

Manager NEM Real Time Operations
     
122699RECALL GEN CAPACITY02/01/2025 08:36:19 AM

Request for Generator Recall Information for the period 06/01/2025 for Region NSW

AEMO ELECTRICITY MARKET NOTICE

Refer to AEMO Electricity Market Notice no. 122697.

Please provide Generator Recall Information for the period 06/01/2025, by 1200 hrs on 03/01/2025 via the Generator Recall communication system, in accordance with clause 4.8.5A of the National Electricity Rules.

SO_OP_3719 Procedure for Submitting Generator Outage Recall Information is available at:
https://aemo.com.au/-/media/files/electricity/nem/security_and_reliability/power_system_ops/procedures/so_op_3719-procedure-for-submitting-recall-information-scheduled-generator-outages.pdf

Procedure on how to use Generator Recall in the EMMS Markets Portal is available at
http://www.aemo.com.au/-/media/Files/Electricity/NEM/IT-Systems-and-Change/2018/Guide-to-Generator-Recall-Plans.pdf


AEMO Operations
     
X