Filter by category
Filter by Date
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 15/01/2025
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 15/01/2025
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1430 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs
The capacity reserve requirement is 1430 MW
The minimum capacity reserve available is 744 MW
Manager NEM Real Time Operations
[EventId:202501151425_review] Prices for interval 15-Jan-2025 14:25 are subject to review
Issued by Australian Energy Market Operator Ltd at 1420 hrs on 15 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 15-Jan-2025 14:25.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501151420_review] Prices for interval 15-Jan-2025 14:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1415 hrs on 15 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 15-Jan-2025 14:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501151415_review] Prices for interval 15-Jan-2025 14:15 are subject to review
Issued by Australian Energy Market Operator Ltd at 1410 hrs on 15 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 15-Jan-2025 14:15.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501151410_review] Prices for interval 15-Jan-2025 14:10 are subject to review
Issued by Australian Energy Market Operator Ltd at 1405 hrs on 15 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 15-Jan-2025 14:10.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501151405_review] Prices for interval 15-Jan-2025 14:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 1400 hrs on 15 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 15-Jan-2025 14:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202501151400_review] Prices for interval 15-Jan-2025 14:00 are subject to review
Issued by Australian Energy Market Operator Ltd at 1355 hrs on 15 January 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 15-Jan-2025 14:00.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
NEM Local Temperature Alerts for QLD, SA from 15 Jan 2025 to 19 Jan 2025
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
QLD
Rockhampton Ap (39+ Deg C): 16th Jan
SA
Port Augusta Ap (39+ Deg C): 19th Jan
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 123248 has been updated at 0800 hrs to the following:
[1.] From 1630 hrs 15/01/2025 to 1830 hrs 15/01/2025.
The forecast capacity reserve requirement is 1751 MW.
The minimum capacity reserve available is 1629 MW.
Manager NEM Real Time Operations