Filter by category
Filter by Date
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 24/11/2024
Actual Lack Of Reserve Level 1 (LOR1) in the NSW region - 24/11/2024
An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1800 hrs.
The Actual LOR1 condition is forecast to exist until 1830 hrs
The capacity reserve requirement is 1541 MW
The minimum capacity reserve available is 1460 MW
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following periods:
[1.] From 1800 hrs 24/11/2024 to 1900 hrs 24/11/2024.
The forecast capacity reserve requirement is 1538 MW.
The minimum capacity reserve available is 1293 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 27/11/2024
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 120863 has been updated at 1630 hrs 24/11/2024 to the following:
[1.] From 1500 hrs 27/11/2024 to 1530 hrs 27/11/2024.
The forecast capacity reserve requirement is 700 MW.
The minimum capacity reserve available is 473 MW.
[2.] From 1700 hrs 27/11/2024 to 1730 hrs 27/11/2024.
The forecast capacity reserve requirement is 1254 MW.
The minimum capacity reserve available is 804 MW.
[3.] From 2130 hrs 27/11/2024 to 2300 hrs 27/11/2024.
The forecast capacity reserve requirement is 1278 MW.
The minimum capacity reserve available is 1104 MW.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 24/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120858 is cancelled at 1515 hrs 24/11/2024.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period[s]:
[1.] From 1400 hrs 28/11/2024 to 1430 hrs 28/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1310 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 27/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120861 has been updated at 1445 hrs 24/11/2024 to the following:
[1.] From 0830 hrs 27/11/2024 to 0930 hrs 27/11/2024.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 1298 MW.
[2.] From 2300 hrs 27/11/2024 to 0030 hrs 28/11/2024.
The forecast capacity reserve requirement is 1744 MW.
The minimum capacity reserve available is 1218 MW.
Manager NEM Real Time Operations
STPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 26/11/2024
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 120860 has been updated at 1445 hrs 24/11/2024 to the following:
[1.] From 1330 hrs 26/11/2024 to 1400 hrs 26/11/2024.
The forecast capacity reserve requirement is 1430 MW.
The minimum capacity reserve available is 1233 MW.
[2.] From 2330 hrs 26/11/2024 to 0030 hrs 27/11/2024.
The forecast capacity reserve requirement is 1728 MW.
The minimum capacity reserve available is 1260 MW.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 25/11/2024
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Periods:
[1.] From 1630 hrs 25/11/2024 to 1900 hrs 25/11/2024.
The forecast capacity reserve requirement is 1712 MW.
The minimum capacity reserve available is 1307 MW.
Manager NEM Real Time Operations
[EventId:202411231900_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 23 November 2024 19:00
Issued by Australian Energy Market Operator Ltd at 1900 hrs on 23 November 2024
CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 23 November 2024.
Refer to market notice: 120871
AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.
The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1900 hrs on 23 November 2024.
This is an AEMO autogenerated Market Notice.