Planned outage of the Red Cliffs - Wemen - Kerang 220kV line in the VIC region on 30/11/2024.
The Red Cliffs - Wemen - Kerang 220kV line in the Victorian (VIC) region is planned to be out of service from 0400 hrs to 1430 hrs on 30/11/2024.
A credible contingency event during this planned outage may require:
- Load shedding in the Victorian outer grid; and/ or
- Market intervention, such as the issuing of directions.
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
[EventId:202411271805_confirmed] Prices for interval 27-Nov-2024 18:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 18:05.
In accordance with Market Notice 121115 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271830_confirmed] Prices for interval 27-Nov-2024 18:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 18:30.
In accordance with Market Notice 121120 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271825_confirmed] Prices for interval 27-Nov-2024 18:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 18:25.
In accordance with Market Notice 121119 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271820_confirmed] Prices for interval 27-Nov-2024 18:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 18:20.
In accordance with Market Notice 121118 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271815_confirmed] Prices for interval 27-Nov-2024 18:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 18:15.
In accordance with Market Notice 121117 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202411271810_confirmed] Prices for interval 27-Nov-2024 18:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1830 hrs on 27 November 2024
PRICES ARE NOW CONFIRMED for trading interval 27-Nov-2024 18:10.
In accordance with Market Notice 121116 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
Cancellation of Actual (LOR2) condition in the NSW region - 27/11/2024
Cancellation of Actual (LOR2) condition in the NSW region - 27/11/2024
The Actual LOR2 Condition in the NSW Region advised in AEMO Electricity Market Notice No.121101 is cancelled at 1645 hrs 27/11/2024.
Manager NEM Real Time Operations
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 27/11/2024
Actual Lack Of Reserve Level 2 (LOR2) in the NSW region - 27/11/2024
An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the NSW region from 1530 hrs.
The Actual LOR2 condition is forecast to exist until 1700 hrs.
The capacity reserve required is 685 MW
The minimum reserve available is 412 MW
AEMO is seeking an immediate market response.
Manager NEM Real Time Operations