125440ADMINISTERED PRICE CAP09/03/2025 06:28:14 PM

AEMO market notice 125439 was published in error: AP STARTED for ENERGY in SA1 at 09 March 2025 17:55

AEMO ELECTRICITY MARKET NOTICE

Refer market notice 125439

AEMO believes market notice 125439 was published in error.

We believe an ADMINISTERED PRICE PERIOD has NOT been triggered in SA1 region.

AEMO is currently reviewing the event and will update the market as soon as possible.

Issued by Australian Energy Market Operator Ltd at 1820 hrs on 09 March 2025

Manager NEM Real Time Operations
     
125439ADMINISTERED PRICE CAP09/03/2025 05:55:23 PM

[EventId:204] AP STARTED for ENERGY in SA1 at 09 March 2025 17:55

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1755 hrs on 09 March 2025

ADMINISTERED PRICE PERIOD DECLARED in SA1 region.

AEMO has determined that the rolling sum of the uncapped spot prices for the SA1 region over the previous 2016 trading intervals has exceeded the cumulative price threshold (CPT) of $1,573,700.00.

In accordance with Clause 3.14.2(b) of the National Electricity Rules, AEMO has determined that an administered price period will commence at the trading interval starting 1805 hrs on 09 March 2025 and will continue through to the end of that trading day.

An administered price cap (APC) of 600 $/MWh will apply to all trading intervals during this administered price period. This APC will apply to spot prices and to all market ancillary service prices in the SA1 region.

An administered floor price (AFP) of -600 $/MWh will apply to spot prices.

AEMO will continue to monitor the rolling sum of the uncapped spot prices and issue further Market Notices as required.

This is an AEMO autogenerated Market Notice.
     
125081CONSTRAINTS25/02/2025 08:31:51 AM

Yass to Wagga control scheme change - removal system normal constraint equations in NSW managing 990, 991 and 970 132kV lines

AEMO ELECTRICITY MARKET NOTICE

Transgrid has advised AEMO of an update to the Yass overload trip scheme. The scheme is normally armed managing line flow on 990, 991, 970 132kV lines and it is now operating both directions of flow from Wagga to Yass.

Based on this advice, the following constraint equations will be removed from the NSW system normal constraint sets N-NIL and N-NIL_991, effective immediately.

N>>NIL_970_051
N>>NIL_990_051
N>>NIL_991_051

Ben Blake
AEMO Operations
     
124586RESERVE NOTICE13/02/2025 10:47:48 AM

PDPASA - Update of the suspect Lack Of Reserve Level 2 (LOR2) condition in the QLD Region on 13/02/2025

AEMO ELECTRICITY MARKET NOTICE

The suspect LOR2 condition advised in AEMO Electricity Market Notice No. 124585 has been reviewed.

AEMO considers this forecast LOR2 condition invalid

No LOR2 condition is currently forecast for the QLD region.

Manager NEM Real Time Operation
     
124585RESERVE NOTICE13/02/2025 06:45:48 AM

PDPASA - Suspect Lack Of Reserve Level 2 (LOR2) in the QLD Region on 13/02/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO considers that there is a suspect Forecast LOR2 condition for the QLD region for the following period[s]:

[1.] From 1830 hrs 13/02/2025 to 1930 hrs 13/02/2025.
The forecast capacity reserve requirement is 639 MW.
The minimum capacity reserve available is 480 MW.

AEMO is currently investigating this LOR2 forecast condition to confirm whether they are valid.

Manager NEM Real Time Operations
     
124575RESERVE NOTICE12/02/2025 07:42:14 PM

Cancellation of Actual (LOR2) condition in the SA region - 12/02/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR2) condition in the SA region - 12/02/2025

The Actual LOR2 Condition in the SA Region advised in AEMO Electricity Market Notice No.124573 is cancelled at 1940 hrs 12/02/2025.

Manager NEM Real Time Operations
     
124573RESERVE NOTICE12/02/2025 07:15:02 PM

Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 12/02/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 2 (LOR2) in the SA region - 12/02/2025

An Actual LOR2 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the SA region from 1900 hrs.
The Actual LOR2 condition is forecast to exist until 1930 hrs

The capacity reserve required is 245 MW
The minimum reserve available is 107 MW

AEMO is seeking an immediate market response.

An insufficient market response may require AEMO to implement a AEMO intervention event.

Manager NEM Real Time Operations
     
124241RESERVE NOTICE06/02/2025 01:30:02 PM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 07/02/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 124235 is cancelled at 1200 hrs 06/02/2025.

No LOR2 condition is currently forecast in the STPASA period.

AEMO Operations
     
124235RESERVE NOTICE06/02/2025 10:42:55 AM

STPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 07/02/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 124230 has been updated at 1000 hrs 06/02/2025 to the following:

From 1600 hrs to 1930 hrs 07/02/2025.
The forecast capacity reserve requirement is 1092 MW.
The minimum capacity reserve available is 574 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.

AEMO Operations
     
X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm