Filter by category
Filter by Date
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 124618
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1600 hrs 13/02/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0030 hrs 14/02/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 15/02/2025.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations
Update - Foreseeable AEMO intervention in SA region
Update - Foreseeable AEMO intervention in SA region
Refer AEMO Electricity Market Notice 124613
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0030 hrs 14/02/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
AEMO estimates that, in the absence of sufficient market response by 1600 hrs 13/02/2025, AEMO may need to intervene by issuing a direction.
Manager NEM Real Time Operations
Cancellation of Forecast Minimum System Load (MSL) MSL1 event in the Vic Region on 16/02/2025
Cancellation - Forecast MSL1 - VIC Region at 1400 hrs 13/02/2025.
Refer to Market Notice 124560 for MSL1.
AEMO Operations
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
Foreseeable AEMO intervention under clause 4.8.5A (a) of the NER in SA region
AEMO has identified a foreseeable circumstance that may require an AEMO intervention event in the SA region from 0030 hrs 14/02/2025.
The foreseeable circumstance requiring the need for intervention is Voltage.
Manager NEM Real Time Operations
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Cancellation: Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 124566
Direction is cancelled from: 1530 hrs 13/02/2025
Manager NEM Real Time Operations
[EventId:202502131150_confirmed] Prices for interval 13-Feb-2025 11:50 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1215 hrs on 13 February 2025
PRICES ARE NOW CONFIRMED for trading interval 13-Feb-2025 11:50.
In accordance with Market Notice 124599 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502131215_confirmed] Prices for interval 13-Feb-2025 12:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1215 hrs on 13 February 2025
PRICES ARE NOW CONFIRMED for trading interval 13-Feb-2025 12:15.
In accordance with Market Notice 124604 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502131210_confirmed] Prices for interval 13-Feb-2025 12:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1215 hrs on 13 February 2025
PRICES ARE NOW CONFIRMED for trading interval 13-Feb-2025 12:10.
In accordance with Market Notice 124603 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202502131205_confirmed] Prices for interval 13-Feb-2025 12:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1215 hrs on 13 February 2025
PRICES ARE NOW CONFIRMED for trading interval 13-Feb-2025 12:05.
In accordance with Market Notice 124602 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.