PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 15/01/2025 to 1800 hrs 15/01/2025.
The forecast capacity reserve requirement is 1765 MW.
The minimum capacity reserve available is 1739 MW.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Wednesday, 15 January 2025
NON-CONFORMANCE QLD1 Region Wednesday, 15 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 15/01/2025 02:40 to 15/01/2025 05:15
Amount: -28 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025
The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 123206 is cancelled at 0450 hrs 15/01/2025.
Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Wednesday, 15 January 2025
NON-CONFORMANCE QLD1 Region Wednesday, 15 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_2
Duration: 15/01/2025 01:45 to 15/01/2025 02:05
Amount: 32 MW
Constraint: NC-Q_MPP_2
Auto-generated on behalf of Manager NEM Real Time Operations
NON-CONFORMANCE Region QLD1 Wednesday, 15 January 2025
NON-CONFORMANCE QLD1 Region Tuesday, 14 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: MPP_1
Duration: 14/01/2025 23:05 to 15/01/2025 00:05
Amount: 17 MW
Constraint: NC-Q_MPP_1
Auto-generated on behalf of Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB3 TORRENS ISLAN
Refer to Market Notice 123215
TORRB3 TORRENS ISLAN at 0730 hrs 15/01/2025 to Remain synchronised and follow dispatch targets.
The TORRB3 TORRENS ISLAN direction is expected to stay in place until 0400 hrs 16/01/2025.
The direction update is issued at 1900 hrs 14/01/2025.
Manager NEM Real Time Operations
NON-CONFORMANCE Region NSW1 Tuesday, 14 January 2025
NON-CONFORMANCE NSW1 Region Tuesday, 14 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: VP6
Duration: 14/01/2025 18:00 to 14/01/2025 18:05
Amount: -108 MW
Constraint: NC-N_VP6
Auto-generated on behalf of Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 14/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1800 hrs 14/01/2025 to 1900 hrs 14/01/2025.
The forecast capacity reserve requirement is 1580 MW.
The minimum capacity reserve available is 1423 MW.
Manager NEM Real Time Operations
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Direction - SA region to AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 123213
In accordance with section 116 of the National Electricity Law, AEMO is issuing a direction to AGL SA Generation Pty Limited. For the purposes of the National Electricity Rules this is a direction under clause 4.8.9(a1)(1).
Direction issued to: AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN at 1600 hrs 14/01/2025
Type of resource: generating unit
Required actions: Remain synchronised and follow dispatch targets at 0730 hrs 15/01/2025
Services provided: Voltage Control
Circumstances necessitating the Direction: Voltage
Circumstances necessitating the Direction additional detail: The synchronous generating units currently expected to be synchronised in SA will be inadequate to maintain sufficient Voltage Control in SA. Intervention is required to maintain the power system in a secure operating state
Expected duration: 0400 hrs 16/01/2025.
AGL SA Generation Pty Limited does not incur any civil monetary liability for a relevant action taken in accordance with this direction unless the action is taken in bad faith.
Manager NEM Real Time Operations