123152RESERVE NOTICE13/01/2025 07:20:59 AM

PDPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 13/01/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:


[1.] From 1730 hrs 13/01/2025 to 1830 hrs 13/01/2025.
The forecast capacity reserve requirement is 1815 MW.
The minimum capacity reserve available is 1796 MW.


Manager NEM Real Time Operations
     
123108RESERVE NOTICE12/01/2025 02:29:39 PM

STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 15/01/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:

From 1730 hrs 15/01/2025 to 1930 hrs 15/01/2025.
The forecast capacity reserve requirement is 1859 MW.
The minimum capacity reserve available is 1580 MW.


Manager NEM Real Time Operations
     
123079INTER-REGIONAL TRANSFER12/01/2025 10:18:12 AM

Inter-regional transfer limit variation - Armidale-Sapphire 8E 330 kV line - NSW region - 12/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Armidale-Sapphire 8E 330 kV line - NSW region - 12/01/2025

A planned outage of Armidale-Sapphire 8E 330 kV line in the NSW region was scheduled from 0500 hrs 12/01/2025 to 1700 hrs 12/01/2025.

The outage has been completed and Armidale-Sapphire 8E 330kV line returned to service at 1015 hrs 12/01/2025

Constraint set(s) revoked:
N-ARSR_8E
N-DM_SVC
N-TW_SVC
N-X_8E+DM+TW+LS_SVC

Manager NEM Real Time Operations
     
123036INTER-REGIONAL TRANSFER11/01/2025 01:11:48 PM

Inter-regional transfer limit variation - [outage element] - TAS region - 11/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - [outage element] - TAS region - 11/01/2025

At 1233 hrs 11/01/2025 there was an unplanned outage of Gordon - Chapel St No 1 220 kV line. There was approximately 52 MW of load reduction at Nyrstar.

The following constraint set(s) were invoked at 1240 hrs
F-T-CSGO
T-CSGO

This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
122985INTER-REGIONAL TRANSFER09/01/2025 12:50:38 PM

Inter-regional transfer limit variation - Armidale-Uralla 8U 330kV Line - NSW region - 09/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Armidale-Uralla 8U 330kV Line - NSW region - 09/01/2025

A planned outage of Armidale-Uralla 8U 330kV Line in the NSW region was scheduled from 0500 hrs 09/01/2025 to 1700 hrs 09/01/2025.

The outage has been completed and Armidale-Uralla 8U 330kV Line returned to service at 1250 hrs 09/01/2025

Constraint set revoked: N-ARUL_8U

Manager NEM Real Time Operations
     
122962INTER-REGIONAL TRANSFER08/01/2025 12:20:09 PM

Inter-regional transfer limit variation - Hummocks - Bungama - Snowtown 132kV Line - SA region - 08/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Hummocks - Bungama - Snowtown 132kV Line - SA region - 08/01/2025

At 1210 hrs 08/01/2025 there was a short notice outage of Hummocks - Bungama - Snowtown 132kV Line.

The following constraint set(s) invoked at 1210 hrs 08/01/2025
S-HUBG

This constraint set(s) contains equations with the following interconnectors on the LHS.
V-S-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
122961INTER-REGIONAL TRANSFER08/01/2025 12:09:21 PM

Inter-regional transfer limit variation - constraint automation to manage Power System Security in NSW region - 08/01/2025

AEMO ELECTRICITY MARKET NOTICE

In order to maintain the power system in a secure operating state in the NSW region, AEMO has invoked automated constraint set CA_BRIS_56906542 from 1155 hrs until further notice.

This constraint set contains equations with the following interconnector on the LHS;

V-S-MNSP1
VIC1-NSW1

Manager NEM Real Time Operations
     
122920INTER-REGIONAL TRANSFER07/01/2025 03:36:39 AM

Inter-regional transfer limit variation - constraint automation to manage Power System Security in VIC region - 07/01/2025

AEMO ELECTRICITY MARKET NOTICE

In order to maintain the power system in a secure operating state in the VIC region, AEMO has invoked automated constraint set CA_BRIS_5687999A from 0330 hrs until further notice.

This constraint set contains equations with the following interconnector on the LHS;

V-S-MNSP1

Refer to AEMO Network Outage Scheduler (NOS) for further information.

Manager NEM Real Time Operations
     
122902RESERVE NOTICE06/01/2025 02:32:01 PM

PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 06/01/2025

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR1 condition in the NSW region advised in AEMO Electricity Market Notice No. 122896 is cancelled at 1430 hrs 06/01/2025.