Filter by category
Filter by Date
[EventId:202501241640_confirmed] Prices for interval 24-Jan-2025 16:40 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 16:40.
In accordance with Market Notice 123679 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241700_confirmed] Prices for interval 24-Jan-2025 17:00 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 17:00.
In accordance with Market Notice 123684 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241655_confirmed] Prices for interval 24-Jan-2025 16:55 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 16:55.
In accordance with Market Notice 123683 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241645_confirmed] Prices for interval 24-Jan-2025 16:45 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 16:45.
In accordance with Market Notice 123680 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241635_confirmed] Prices for interval 24-Jan-2025 16:35 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1700 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 16:35.
In accordance with Market Notice 123677 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 123671 is cancelled at 1645 hrs 24/01/2025.
Manager NEM Real Time Operations
Project Energy Connect (PEC-1) testing 25th January 2025 0100-0300 for flows from Victoria to South Australia direction up to 150 MW
Refer to market notice 122115
There is an opportunity for testing Project Energy Connect (PEC-1) for flows from Victoria to South Australia direction up to 150 MW on 25th January from 01:00hrs to 03:00hrs
This test includes switching of transmission lines and reactive plant in South Australia and in New South Wales.
Please also refer to the published formal PEC Stage 1 and HIC capacity release testing information at the following link https://aemo.com.au/-/media/files/stakeholder_consultation/consultations/nem-consultations/2023/project-energyconnect-stage-1-and-hic-capacity-release/pec-stage-1-and-hic---final-test-program.pdf?la=en.
Ben Blake
AEMO Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the NSW Region on 28/01/2025
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following period:
From 1500 hrs to 1830 hrs 28/01/2025.
The forecast capacity reserve requirement is 1400 MW.
The minimum capacity reserve available is 859 MW.
AEMO Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 1 (LOR1) in the QLD Region on 24/01/2025
The Forecast LOR1 condition in the QLD region advised in AEMO Electricity Market Notice No. 123649 has been updated to the following:
[1.] From 1830 hrs 24/01/2025 to 1900 hrs 24/01/2025.
The forecast capacity reserve requirement is 854 MW.
The minimum capacity reserve available is 812 MW.
Manager NEM Real Time Operations