Project Energy Connect (PEC-1) testing 25th January 2025 0100-0300 for flows from Victoria to South Australia direction up to 150 MW
Refer to market notice 122115
There is an opportunity for testing Project Energy Connect (PEC-1) for flows from Victoria to South Australia direction up to 150 MW on 25th January from 01:00hrs to 03:00hrs
This test includes switching of transmission lines and reactive plant in South Australia and in New South Wales.
Please also refer to the published formal PEC Stage 1 and HIC capacity release testing information at the following link https://aemo.com.au/-/media/files/stakeholder_consultation/consultations/nem-consultations/2023/project-energyconnect-stage-1-and-hic-capacity-release/pec-stage-1-and-hic---final-test-program.pdf?la=en.
Ben Blake
AEMO Operations
[EventId:202501241110_confirmed] Prices for interval 24-Jan-2025 11:10 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 11:10.
In accordance with Market Notice 123653 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241130_confirmed] Prices for interval 24-Jan-2025 11:30 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 11:30.
In accordance with Market Notice 123658 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241125_confirmed] Prices for interval 24-Jan-2025 11:25 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 11:25.
In accordance with Market Notice 123657 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241120_confirmed] Prices for interval 24-Jan-2025 11:20 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 11:20.
In accordance with Market Notice 123656 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241115_confirmed] Prices for interval 24-Jan-2025 11:15 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 11:15.
In accordance with Market Notice 123655 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
[EventId:202501241105_confirmed] Prices for interval 24-Jan-2025 11:05 are now confirmed
Issued by Australian Energy Market Operator Ltd at 1130 hrs on 24 January 2025
PRICES ARE NOW CONFIRMED for trading interval 24-Jan-2025 11:05.
In accordance with Market Notice 123651 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply
Prices remain unchanged.
This is an AEMO autogenerated Market Notice.
NEM Local Temperature Alerts for QLD, SA, VIC from 24 Jan 2025 to 28 Jan 2025
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
QLD
Dalby Ap (37+ Deg C): 24th Jan
Rockhampton Ap (39+ Deg C): 24th Jan
SA
Port Augusta Ap (39+ Deg C): 26th Jan, 27th Jan
VIC
Latrobe Valley Ap (39+ Deg C): 27th Jan
Melbourne Olympic Park (39+ Deg C): 27th Jan
Mildura Ap (39+ Deg C): 27th Jan
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning
NON-CONFORMANCE Region NSW1 Thursday, 23 January 2025
NON-CONFORMANCE NSW1 Region Thursday, 23 January 2025
AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:
Unit: VP5
Duration: 23/01/2025 19:05 to 23/01/2025 19:10
Amount: -25 MW
Constraint: NC-N_VP5