Market Notices

124754MARKET INTERVENTION16/02/2025 03:57:23 PM

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT

Refer to Market Notice 124723

PPCCGT PELICAN POINT at 0800 hrs 14/02/2025 to Remain synchronised and follow dispatch targets.

The PPCCGT PELICAN POINT direction is now expected to stay in place until 1700 hrs 17/02/2025.

The direction update is issued at 1600 hrs 16/02/2025.

Manager NEM Real Time Operations
     
124753MARKET INTERVENTION16/02/2025 03:57:07 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 124724

TORRB2 TORRENS ISLAN at 0030 hrs 14/02/2025 to Remain synchronised and follow dispatch targets.

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 18/02/2025.

The direction update is issued at 1600 hrs 16/02/2025.

Manager NEM Real Time Operations
     
124749GENERAL NOTICE16/02/2025 11:56:00 AM

QNI Minor testing (NSW to Qld) 16th February 2025 for flows from NSW to Qld up to 850 MW

AEMO ELECTRICITY MARKET NOTICE

Refer to market notice 123692

There is an opportunity for testing QNI Minor for flows from NSW to Qld up to 850 MW on Saturday 16th February 2025 from 1200 hrs to 1800 hrs.

This test includes switching of transmission lines in New South Wales and/or Queensland regions.

Please also refer to the published formal QNI minor testing information at the following link:
https://www.aemo.com.au/consultations/current-and-closed-consultations/qld-to-nsw-interconnector-qni-upgrade

AEMO Operations
     
124748SETTLEMENTS RESIDUE16/02/2025 11:30:27 AM

[EventId:202502161130_NRM_VIC1_SA1_stopped] NEGRES CONSTRAINT NRM_VIC1_SA1 ceased operating from 16 February 2025 11:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1130 hrs on 16 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 February 2025.

Refer to market notice: 124747

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the VIC to SA directional interconnector.

The negative residue constraint NRM_VIC1_SA1 ceased operating at 1130 hrs on 16 February 2025.

This is an AEMO autogenerated Market Notice.
     
124747SETTLEMENTS RESIDUE16/02/2025 09:40:25 AM

[EventId:202502160940_NRM_VIC1_SA1_started] NEGRES CONSTRAINT NRM_VIC1_SA1 started operating from 16 February 2025 09:40

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 0940 hrs on 16 February 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - VIC to SA - 16 February 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the VIC to SA directional interconnector.

The negative residue constraint set NRM_VIC1_SA1 commenced operating from 0940 hrs on 16 February 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
V-S-MNSP1
V-SA

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
124733SETTLEMENTS RESIDUE15/02/2025 05:00:27 PM

[EventId:202502151700_NRM_NSW1_VIC1_stopped] NEGRES CONSTRAINT NRM_NSW1_VIC1 ceased operating from 15 February 2025 17:00

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1700 hrs on 15 February 2025

CANCELLATION - ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 February 2025.

Refer to market notice: 124725

AEMO has ceased taking action to minimize the further accumulation of negative settlement residues on the NSW to VIC directional interconnector.

The negative residue constraint NRM_NSW1_VIC1 ceased operating at 1700 hrs on 15 February 2025.

This is an AEMO autogenerated Market Notice.
     
124729NON-CONFORMANCE15/02/2025 03:55:18 PM

NON-CONFORMANCE Region QLD1 Saturday, 15 February 2025

AEMO ELECTRICITY MARKET NOTICE

NON-CONFORMANCE QLD1 Region Saturday, 15 February 2025

AEMO has declared the following unit as non-conforming under clause 3.8.23 of the National Electricity Rules:

Unit: MPP_2
Duration: 15/02/2025 15:50 to 15/02/2025 15:55
Amount: 15 MW
Constraint: NC-Q_MPP_2

Auto-generated on behalf of Manager NEM Real Time Operations
     
124725SETTLEMENTS RESIDUE15/02/2025 03:30:28 PM

[EventId:202502151530_NRM_NSW1_VIC1_started] NEGRES CONSTRAINT NRM_NSW1_VIC1 started operating from 15 February 2025 15:30

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1530 hrs on 15 February 2025

ACTUAL NEGATIVE SETTLEMENT RESIDUES - NSW to VIC - 15 February 2025.

Electricity Market outcomes have resulted in the accumulation of negative settlement residues that have exceeded the allowable negative residue threshold for the NSW to VIC directional interconnector.

The negative residue constraint set NRM_NSW1_VIC1 commenced operating from 1530 hrs on 15 February 2025.

This constraint set contains an equation with the following interconnectors on the LHS:
VIC1-NSW1

The RHS of the constraint equation may be adjusted to manage residues.


This is an AEMO autogenerated Market Notice.
     
124724MARKET INTERVENTION15/02/2025 03:54:46 PM

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

AEMO ELECTRICITY MARKET NOTICE.

Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN

Refer to Market Notice 124684

TORRB2 TORRENS ISLAN at 0030 hrs 14/02/2025 to Remain synchronised and follow dispatch targets.

The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 17/02/2025.

The direction update is issued at 1600 hrs 15/02/2025.

Manager NEM Real Time Operations
     