Inter-regional transfer limit variation - Palmerston A 220kV Bus - TAS region - 26/03/2025
Inter-regional transfer limit variation - Palmerston A 220kV Bus - TAS region - 26/03/2025
Refer to Market Notice 125962.
The following constraint set(s) invoked from 1600 hrs to 1620 hrs 26/03/2026.
T-LIPM_WACB
T-LIPM_WACB_SL_N-2
This constraint set(s) contains equations with the following interconnectors on the LHS.
T-V-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Non-credible contingency event - TAS region - 26/03/2025
Non-credible contingency event - TAS region - 26/03/2025
At 1551 hrs the Palmerston A 220kV Bus tripped.
AEMO did not instruct load shedding.
AEMO has not been advised of any disconnection of bulk electrical load.
Approximately 40MW of generation was disconnected.
The cause of this non credible contingency event has been identified and AEMO is satisfied that another occurrence of this event is unlikely under the current circumstances.
AEMO will not reclassify this event as a credible contingency event.
Manager NEM Real Time Operations
CHG0102325 - Maintenance activities to be performed on the Gas Short Term Trading Market Systems Pre-Production.
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Short Term Trading Market (STTM)
Change Title: Maintenance activities to be performed on the Gas Short Term Trading Market Systems Pre-Production.
Change Start Date & Time: 31/03/2025 08:00:00
Change End Date & Time: 31/03/2025 17:30:00
Outage Start Date & Time:
Outage End Date & Time:
Environment: Pre-Production
Participant Impact and Requirements: This is a regular procedure to allow routine maintenance. Short service outages over the day for STTM services including SWEX and MIS.
Pre-Production Gas Short Term Trading Market (STTM)
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities .
CHG0101878 - Production MSATS and eMDM Maintenance Activity
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: MDM - Meter Data Management
Change Title: Production MSATS and eMDM Maintenance Activity
Change Start Date & Time: 30/03/2025 10:00:00
Change End Date & Time: 30/03/2025 14:00:00
Outage Start Date & Time: 30/03/2025 10:00:00
Outage End Date & Time: 30/03/2025 14:00:00
Environment: Production
Participant Impact and Requirements: MSATS will be unavailable during this outage.
Meter data processing and RM reports will be unavailable during this outage.
User Rights Management (URM) will continue to operate, however the administration screens will not be accessible.
MSATS B2B/B2M Transactions and B2B MSATS Screens will be unavailable during this outage.
NMI Discovery will be unavailable during this outage.
CDR and CDP will be unavailable during this outage.
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities .
Completed - CHG0101257 - Frequency Performance Payments Release
Notification issued to: Market Notice
Notification Type: Completed
Change Type: Normal
Service/Component: Frequency Performance Payments Engine
Change Title: Frequency Performance Payments Release
Support Information: Report any impacts to the AEMO Information and Support Hub or on External 1300 236 600.
CHG0102031 - Roll out of TLS 1.3 support for Gas B2B Hub and disable TLS versions 1.0/1.1
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Gas Hub
Change Title: Roll out of TLS 1.3 support for Gas B2B Hub and disable TLS versions 1.0/1.1
Change Start Date & Time: 10/04/2025 10:00:00
Change End Date & Time: 10/04/2025 17:00:00
Outage Start Date & Time:
Outage End Date & Time:
Environment: Pre-Production
Participant Impact and Requirements: The Gas B2B hub servers will be updated to support TLS (Transport Layer Security) 1.3 version. Also the legacy versions 1.0 and 1.1 will be disabled and not be supported going forward. Participants are required to use TLS 1.2 as a minimum protocol to communicate with AEMO, failing to do so will impact the connectivity. An outage is not expected but, there may be some minor interruptions during the change period.
Participants are required to make sure the connectivity is intact post change implementation. Incase noticed any issues, please reach out to AEMO Support Hub.
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities .
Cancelled - CHG0102167 - Planned Maintenance to NSW Marketnet Site to Site VPN Router
Notification issued to: Market Notice
Notification Type: Cancelled
Change Type: Normal
Service/ Component: Local Area Network
Change Title: Planned Maintenance to NSW Marketnet Site to Site VPN Router
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities .
Inter-regional transfer limit variation - Lower Tumut - Canberra 07 330kV Line - NSW region - 25/03/2025
Inter-regional transfer limit variation - Lower Tumut - Canberra 07 330kV Line - NSW region - 25/03/2025
A planned outage of Lower Tumut - Canberra 07 330kV Line in the NSW region was scheduled from 1746 hrs 21/03/2025 to 1800 hrs 26/03/2025.
The outage has been completed and Lower Tumut - Canberra 07 330kV Line returned to service at 1555 hrs 25/03/2025
Constraint set(s) revoked: N-CNLT_07
Manager NEM Real Time Operations
CHG0102167 - Planned Maintenance to NSW Marketnet Site to Site VPN Router
Notification issued to: Market Notice
Notification Type: Initial
Change Type: Normal
Service/ Component: Local Area Network
Change Title: Planned Maintenance to NSW Marketnet Site to Site VPN Router
Change Start Date & Time: 29/03/2025 09:00:00
Change End Date & Time: 29/03/2025 17:00:00
Outage Start Date & Time:
Outage End Date & Time:
Environment: Production
Participant Impact and Requirements: The following impacts are expected to participant connectivity during this planned maintenance:
IPWAN Participants - Nil
Lan-2-Lan VPN Participants (IPSEC) - Up to 2 hour outage for participants who have established their VPN connection/s via the AEMO NSW datacenter termination point (202.44.78.10 for Policy Based VPN's or 202.44.78.12 for Route Based VPN) only - All L2L connections should be established to both QLD / NSW.
Note: Participants are encouraged to ensure their VPN connections are already established or are configured (as per AEMO best practice) to automatically failover to the alternate AEMO QLD datacenter termination point (202.44.76.10 or 202.44.76.12) prior to this scheduled outage. *** Failure to do so will impact connectivity to Marketnet Services ***.
B2B VPN - Nil
SSL VPN Participants: Nil
GASHUB: Nil
Other Impacts will have been communicated in advance.
Support Information:
Report any impacts to the AEMO Information and Support Hub or call 1300 236 600.
Please refer to https://aemo.service-now.com/participantportal?id=pp_services_status for any planned/unplanned maintenance activities .