Filter by category
Filter by Date
[EventId:202502181620_review] Prices for interval 18-Feb-2025 16:20 are subject to review
Issued by Australian Energy Market Operator Ltd at 1615 hrs on 18 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 18-Feb-2025 16:20.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502181615_review] Prices for interval 18-Feb-2025 16:15 are subject to review
Issued by Australian Energy Market Operator Ltd at 1610 hrs on 18 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 18-Feb-2025 16:15.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502181610_review] Prices for interval 18-Feb-2025 16:10 are subject to review
Issued by Australian Energy Market Operator Ltd at 1605 hrs on 18 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 18-Feb-2025 16:10.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
[EventId:202502181605_review] Prices for interval 18-Feb-2025 16:05 are subject to review
Issued by Australian Energy Market Operator Ltd at 1600 hrs on 18 February 2025
PRICES ARE SUBJECT TO REVIEW for trading interval 18-Feb-2025 16:05.
AEMO is reviewing these prices in accordance with:
- Clause 3.9.2B of the National Electricity Rules for Manifestly Incorrect Inputs
This is an AEMO autogenerated Market Notice.
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Update Direction - Pelican Point Power Limited - PPCCGT PELICAN POINT
Refer to Market Notice 124819
The PPCCGT PELICAN POINT direction is now expected to stay in place until 0400 hrs 20/02/2025.
The direction update is issued at 1600 hrs 18/02/2025.
Manager NEM Real Time Operations
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Update Direction - AGL SA Generation Pty Limited - TORRB2 TORRENS ISLAN
Refer to Market Notice 124767
The TORRB2 TORRENS ISLAN direction is now expected to stay in place until 0400 hrs 20/02/2025.
The direction update is issued at 1600 hrs 18/02/2025.
Manager NEM Real Time Operations
Planned outage of South Morang - Sydenham No 1 500 kV line in the VIC region beginning on 21/02/2025.
The South Morang - Sydenham No 1 500 kV in the Victoria (VIC) region is planned to be out of service from 0600 hrs on 21/02/2025 to 1700 hrs on 24/02/2025.
A credible contingency event during this planned outage could cause:
* A large reduction in generation in VIC; and/ or
* Restrict power transfer across the VIC - South Australia (SA) interconnector (Heywood interconnector).
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
Planned outage of Moorabool - Sydenham No 1 500 kV line in the VIC region beginning on 23/02/2025.
The Moorabool - Sydenham No 1 500 kV line in the Victoria (VIC) region is planned to be out of service from 0600 hrs to 1600 hrs on 23/02/2025.
A credible contingency event during this planned outage may require market intervention, such as the issuing of directions.
Refer AEMO Network Outage Schedule (NOS) for further details.
AEMO Operations
NEM Local Temperature Alerts for SA, VIC from 18 Feb 2025 to 22 Feb 2025
AEMO's weather service provider has issued forecast temperatures equal to or greater than the NEM Local Temperature Alert Levels for listed weather stations below.
SA
Mt Gambier Ap (39+ Deg C): 22nd Feb
Port Augusta Ap (39+ Deg C): 22nd Feb
VIC
Mildura Ap (39+ Deg C): 22nd Feb
The NEM Local Temperature Alert Levels are:
Launceston Ti Tree Bend: 33 Deg C, Dalby Airport: 37 Deg C, for all other selected weather stations: 39 Deg C.
AEMO requests Market Participants to:
1. review the weather forecast in the local area where their generating units / MNSP converter stations are located and,
2. if required, update the available capacity in their dispatch offers or availability submissions consistent with the forecast temperatures.
Further information is available at:
https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/nem-forecasting-and-planning/forecasting-and-reliability/projected-assessment-of-system-adequacy/nem-local-temperature-alerts
AEMO Operations Planning