Market Notices

123602RESERVE NOTICE22/01/2025 08:14:17 PM

Cancellation of Actual (LOR1) condition in the QLD region - 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual (LOR1) condition in the QLD region - 22/01/2025

The Actual LOR1 Condition in the QLD Region advised in AEMO Electricity Market Notice No.123589 is cancelled at 2015 hrs 22/01/2025.

Manager NEM Real Time Operations
     
123601INTER-REGIONAL TRANSFER22/01/2025 08:11:14 PM

Cancellation -Inter-regional transfer limit variation - Constraint invocation to manage Power System Security in NSW region - 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

Cancellation -Inter-regional transfer limit variation - Constraint invocation to manage Power System Security in NSW region - 22/01/2025

Refer to MN 123588

In order to maintain the power system in a secure operating state in the NSW region (Northern NSW) ,

AEMO has invoked constraint set #N-Q-MNSP1_E from 1720 hrs until 1845 hs 22/01/2025.

This constraint set contains equations with the following interconnector on the LHS;
N-Q-MNSP1

Manager NEM Real Time Operations
     
123597INTER-REGIONAL TRANSFER22/01/2025 07:53:16 PM

Inter-regional transfer limit variation -Lismore No1 SVC - NSW region - 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Lismore No1 SVC - NSW region - 22/01/2025

A planned outage of Lismore No1 SVC in the NSW region was scheduled from 0620 hrs 08/01/2025 to 1600 hrs 24/01/2025.

The outage has been completed and Lismore No1 SVC returned to service at 1900 hrs 22/01/2025

Constraint set(s) revoked: N-LS_VC1

Manager NEM Real Time Operations
     
123593RESERVE NOTICE22/01/2025 06:14:27 PM

PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following Period:


[1.] From 1830 hrs 22/01/2025 to 1900 hrs 22/01/2025.
The forecast capacity reserve requirement is 456 MW.
The minimum capacity reserve available is 343 MW.


AEMO is seeking a market response.

AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
123589RESERVE NOTICE22/01/2025 05:47:39 PM

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 22/01/2025

AEMO ELECTRICITY MARKET NOTICE

Actual Lack Of Reserve Level 1 (LOR1) in the QLD region - 22/01/2025

An Actual LOR1 condition has been declared under clause 4.8.4(b) of the National Electricity Rules for the QLD region from 1730 hrs.
The Actual LOR1 condition is forecast to exist until 1930 hrs

The capacity reserve requirement is 854 MW
The minimum capacity reserve available is 543 MW

Manager NEM Real Time Operations
     
123588INTER-REGIONAL TRANSFER22/01/2025 05:29:02 PM

Inter-regional transfer limit variation - Constraint invocation to manage Power System Security in NSW region - 25/01/2025

AEMO ELECTRICITY MARKET NOTICE

In order to maintain the power system in a secure operating state in the NSW region (Northern NSW) , AEMO has invoked constraint set #N-Q-MNSP1_E from 1720 hrs until further notice.

This constraint set contains equations with the following interconnector on the LHS;
N-Q-MNSP1

Manager NEM Real Time Operations
     
123570PRICES UNCHANGED22/01/2025 02:12:41 PM

[EventId:202501221345_confirmed] Prices for interval 22-Jan-2025 13:45 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1405 hrs on 22 January 2025

PRICES ARE NOW CONFIRMED for trading interval 22-Jan-2025 13:45.

In accordance with Market Notice 123558 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
123569PRICES UNCHANGED22/01/2025 02:10:59 PM

[EventId:202501221405_confirmed] Prices for interval 22-Jan-2025 14:05 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1405 hrs on 22 January 2025

PRICES ARE NOW CONFIRMED for trading interval 22-Jan-2025 14:05.

In accordance with Market Notice 123564 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     
123568PRICES UNCHANGED22/01/2025 02:09:40 PM

[EventId:202501221400_confirmed] Prices for interval 22-Jan-2025 14:00 are now confirmed

AEMO ELECTRICITY MARKET NOTICE

Issued by Australian Energy Market Operator Ltd at 1405 hrs on 22 January 2025

PRICES ARE NOW CONFIRMED for trading interval 22-Jan-2025 14:00.

In accordance with Market Notice 123562 AEMO has reviewed this trading interval and determined that:
- Manifestly Incorrect Inputs did not apply

Prices remain unchanged.


This is an AEMO autogenerated Market Notice.
     